NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Did we lose access to all the MPR2 LEEDuser Forum questions and comments posted prior to the 09/05/17 upgrade?
LEED-NC and Interior Fitout
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by CT G on
An owner is developing an office building which is to 75% occupied by one company (different from the owner developing the building).
Certifying floor area
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Romain Bourcier on
Dear all, My client has an existing mixed-use building. There are stores on the ground floor and offices on the upper floors. The refurbishment works only apply to the offices areas. Do I have to
NC-2009 MPR 2 - new distinct building attached to existing
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kenneth Ruby on
We are designing a new 116,000 SF, 8 story University building to house distinct academic departments.
Low impact Eco Resort
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Covello on
Hello, My company is looking to partner with the development of a low impact resort on an island located in Myanmar.
Additions, Separate Utility Building, Campus Site
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Michele Helou on
I'm trying to verify an acceptable LEED Project Boundary for a LEED NC v3 project.
Superstructure vs. Multiple Buildings Mid-Review Clarification
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Matthew Macko on
I am currently working on a large, outdoor retail shopping mall that includes multiple buildings, however we want to claim these buildings are more like connected ‘structures’ and therefore the who
Addition To An Existing Certified Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building. There w
MPR 2 - Separate Ownership
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Weiss on
I am curious about the separate function AND ownership requirement for an addition to a non-certified building.
Certifying New Addition, excluding Existing Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kris Phillips on
A client is preparing for the development and design of a sizeable New Addition to an Existing Facility in Europe.