Dear All:- As of now we are using berkeley.edu/comfort tool for thermal comfort compliance for both A/c & Non A/c area But we use PMV method for A/c area and adaptive method for Non A/c area (Ventilation area) because we don't have RH & air speed details for ventilation area 1.Is it correct to use Adaptive method for ventilation areas 2.Can we enter space temperature as operative temperature in above tool 3.If the Adaptive method is not applicable means which area can be used in adaptive methods Kindly advise how to use this tool for both A/c and Non A/c area What are the suitable spaces for PMV & Adaptive methods respectively
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.