We just received the Preliminary Construction Review Report from LEED and are happy to accept the results of the preliminary review as final. Unfortunatly the Pilot credit worth 1 point is pending. When I try to skip the review, I get the following message- "The review cannot be skipped at this time. To skip Construction Final review, all pending credits must be withdrawn: 1". It is unfortunately not possible from my end to withdraw only the pilot credit. I can only withdraw the Innovation section which would lead to the project losing 4 points, and drop its certification from Platinum to Gold. Could you please assist me in withdrawign only the Pilot credit (1 point)? Thank you in advance :)