Hello.

I have modeled a proposed building including PV and solar thermal systems.
The energy generated of PV system is excluded of End Uses results, but the energy generateds of Solar thermal is integrated in DHW system and it is subtracted of DHW energy consumption.
So, I include only PV energy generated in Table L-1 of LEED Template, i don´t include the energy generated by Solar Thermal.
However i include PV and Solar thermal energy in LEED Templated of EAc2.
Is the right approach?

Secondly, the reviewer request me to justify calculations of renewable energy generation. The calculations are based in Energy simulation results (Energy Plus).
My answer must be that renewable generation is based on Energy Simulation? and inform you thet see the results of renewable energy generated in Annual Building Utility Performance Summary (Energy Plus)?
Is the right approach?

Thanks!!