Hello,
We have modelled(proposed) a complex railway station having different wall areas on all the 4 sides of the structure. The simulated report provides the WWR of 47%.
We are having an issue of equally distributing the baseline fenestration area complying to WWR of 40% on all the 4 sides of the structure. The wall area on the smaller sides tend to be less than the divided fenestration area required for 40% WWR.
Can anyone suggest how to go forward with this kind of situation? Thanks in advance
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5912 thumbs up
December 6, 2024 - 9:38 am
Rather than equally distribute the windows I would distribute them proportionately so that each orientation has a 40% WWR.