We are participating in LEED CS v2009 certification in an office building.
This project consists of changing the HVAC system in the building.
During the remodeling, this building was occupied by a tenant which is not participating in the certification.
Before the remodeling, this tenant had a Data Center and a cooling system.
And he has kept these equipments after the remodeling. The building owner is not responsible of these equipments.
Is it mandatory to include the refrigerant of cooling system of tenant’s Data Center in the calculation of Enhanced Refrigerant Management?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.