This is referenced most directly in the EBOMv2009 submittal template and should be considered a requirement:
"Describe the plumbing fixture and fitting inspection, testing or preventive maintenance program in place for the
project building. Describe how the inspection, testing or program ensures the following:
1) Flush and/or flow valves do not leak and
2) Auto-flush and/or flow sensors are calibrated so fixtures flush and/or flow properly and at the proper time
but not too often or for too long a time (i.e., generally only one flush per fixture use)"