I am looking at the "Negatively Pressurized Rooms" section for this credit, and I noticed that separation method includes an option for hard-lid ceiling.  I am curious, after looking at the finalized bid drawings for the project building, is painted gypsum ceiling considered a hard-lid ceiling??