Our project office building has 22 floors and is divided in 4 portions – north wing, south wing, east wing and west wing. The total area of each wing (from ground floor to 22nd floor) is about 40,000 ft². The four wings are connected with the shared corridors on every floor.

Each wing is vertically supplied through a separated AHU. That means there are 4 AHUs. All AHUs are DOAS system.

According to LEED reference guide, at least 1 sample per 25000 ft² in each portion of the building served by a separate ventilation system must be taken.

Does that mean, we need at 2 samples for each wing and 8 samples in total for entire building?

Thank you very much in advance.