The v06 Materials and Resources Calculator seems to have an issue with MRc5 for ID+C projects. In the old ID+C calculator, there were separate columns for % regionally manufactured and % regionally manufactured that is also regionally extracted. However, in the new calculator, there is only one column for % regional, and a column to select Option 1 or Option 2. This means that each line item is only able to contribute to Option 1 or Option 2.

If 100% is regionally manufactured, but only 50% is regionally extracted, it seems that the only way to report this would be to split the product into two line items and divide the cost between them. Furthermore, the reviewer would then need to add the Option 2 value to Option 1 in the summary tab in order to obtain the full value that qualifies for Option 1.

Has anyone dealt with this? Is there a convenient and intuitive way to report this information with the new calculator?