Our project is a group certification with two separate buildings. They are more than 200 yards apart. We have only included showers in one of the buildings, next to the gym. Employees in the showerless building may check in at the building with showers, however they do not primarily work at that location. Is this an acceptable strategy to achieve this credit?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Stacey Olson
SW Regional Design Resilience LeaderGensler
16 thumbs up
August 3, 2015 - 3:11 pm
We had a similar situation, and filed a CIR to confirm if a central locations for showers were acceptable or not.
They responded that as long as the entrances between the buildings was less than 200 yards, the showers would be in compliance. However, my project exceeds this requirement so the credit is not viable. My understanding is that in Campus projects, this might be different - but Campus Group projects, each building must each comply with the requirements on its own.