For LEED 2009, when modeling the proposed building which incorporates the DES (Method 2) how is the DES plant modeled?

As the central plant is huge in comparison to the proposed building load, is a fraction (say peak building cooling load / central plant cooling system) applied to each system? In other words, I scale down the DES plant to match the proposed building loads? Similarly apply the same methodology to the heating plant, pump size, flow rates etc.? I then apply the efficiencies of the plant that I have received from the DES operator?

Furthermore, the DES is a CHP plant. Does anybody have experience in modeling a CHP. I'm finding the guidance in Appendix D difficult to follow.

Your help is greatly appreciated.

Kind Regards,

Dónal