We are dealing with a Commercial Interior Project, which is located inside a LEED C&S certified building.

Regarding the credit SSc3.2, the attendance of the LEED C&S building (SSc4.2) does not guarantee compliance in the LEED CI once the methodology used to determine each number of racks use a different percentage (3% of the occupants for up to 300,00sf and an additional 0,5% for the occupants over 300,000sf for LEED CS vs. 5% or more of tenant occupants for LEED CI) which using the same occupancy will retrieve obviously different quantities, not being able to use the provided rack from the C&S building?