Greetings, we have a doubt with regards to this credit: If a piece of medical equipment uses potable water for once-through cooling (as recommended by the manufacturer), but the discharged water is collected in a gray water system for later reuse, would the project comply with this prerequisite? Even though the cooling system is once-through, the water use is not once-through. That is why we have this doubt. Any ideas?