We have already had our EAp2/EAc1 energy model credits reviewed and approved. In an effort to achieve a higher LEED rating, the owner has opted to purchase REC's. However, the EAc6 LOF is showing the required basis for green power/REC purchase to be the KWh from EAp2 - Table 6 - without subtracting for Kwh from the exceptional calculations. Does anyone know if this is an LOF error - shouldn't the approved proposed model Kwh (including the benefit from except calc) be the basis for green power or REC purchase?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5914 thumbs up
November 12, 2012 - 2:08 pm
Yes the approved proposed model kWh should be the basis for the EAc6 calculation. Not sure if there is a form error.