We have already had our EAp2/EAc1 energy model credits reviewed and approved. In an effort to achieve a higher LEED rating, the owner has opted to purchase REC's. However, the EAc6 LOF is showing the required basis for green power/REC purchase to be the KWh from EAp2 - Table 6 - without subtracting for Kwh from the exceptional calculations. Does anyone know if this is an LOF error - shouldn't the approved proposed model Kwh (including the benefit from except calc) be the basis for green power or REC purchase?