I am documenting a Winery that is being built on a Greenfield. We have set the limits of construction of the project in accordance with the LEED requirements. What I am inquiring is if the limits of construction need to be within the LEED Boundary or if the limits of construction are able to go outside the LEED boundary. Since the certification is only within the LEED boundary should the limits of construction also fall within this area?