Does the demolition of an existing building have to be included in the Construction Waste management Plan if it is part of an early Site package which is happening about 8 months before the construction of a new building. The problem with including the demolition is how to coordinate between a demolition contractor and the general trades contractor who will not bid the job until long after demolition is complete. For instance, who should sign the signature box on the LEED form? Also, if the demolition contractor goes by weight, does that prevent the general trades contractor from going by volume? Or should we just use an alternative compliance path?