In the case of the Fully Automated Response Event Management, is the Meter that is shown providing feedback to the Utility/ISO/CSP suppose to be the Utility's Meter that comes with the Electrical Service? Or does a more advanced separate Tenant Metering system (in addition to the Utility Meter) need to be installed to report building Interval meter load information back to the Utility/ISO/CSP to view load data?  In the case of the Semi Automated Response Event Management, is Interval metered feedback required by the utility at all?