I've read through the string here and can't seem to find an answer to my question. After the initial design review (in this case for WEp1) can the final design review for that credit be deferred to the final construction review? Depending on anticipated points at that stage, the owner may decide to install different flush valves to achieve additional water savings (and antoher 2 points).