We have a project with an existing LEED adjacent building to the new LEED building.

Both buildings are conected by the interior and the exterior and owned by the same landlord. The landlord have expressed the intention of using only the changing room of the adjacent building and not include new showers in the LEED building.
The new building will have bicycle storage.

The adjacent building have enough showers and changing room for the FTE of both buildings

Is this an acceptable strategy to achieve this credit with the correspondent narrative?