We got a response back from GBCI today for WEp3 after asking about the metering requirement for the "associated grounds". Our project, part of a college campus, has a LEED site boundary that for the most part is irrigated as part of a larger irrigation loop fed from a different building. The entire loop is sub-metered with an abatement meter, but our specific LEED boundary isn't sub-metered, as is typical for campus projects and the somewhat arbitrary LEED boundaries. We were told we have to provide engineering calcs estimating the landscaped area in our LEED boundary to comply with WEp3 combined with the fact that the irrigation is being sub-metered for a slightly different area. I assume for reporting the client will have to prorate the monthly water usage for the irrigation loop using these calcs. Thought others may want to see.