Schools-2009 MRc3: Materials Reuse
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Use salvaged, refurbished or reused materials, the sum of which constitutes at least 5% or 10% , based on cost, of the total value of materials on the project. The minimum percentage materials reused for each point threshold is as follows:
See all forum discussions about this credit »Frequently asked questions
Can I include reused furniture?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
A material being reused contains recycled content. Can I count this under MRc3 and MRc4?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are reusing a lot of equipment from another building. Can we count that?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are demolishing an existing building, crushing the concrete and stone, and using it as fill onsite. Does this count under MRc3?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Our project has access to building materials that were delivered for another project, and never used because that project was canceled. If we use these materials can we count them here?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can crushed concrete, masonry or asphalt being reused onsite qualify as materials reuse?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Use salvaged, refurbished or reused materials, the sum of which constitutes at least 5% or 10% , based on cost, of the total value of materials on the project. The minimum percentage materials reused for each point threshold is as follows:
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Frequently asked questions
Can I include reused furniture?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
A material being reused contains recycled content. Can I count this under MRc3 and MRc4?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are reusing a lot of equipment from another building. Can we count that?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
We are demolishing an existing building, crushing the concrete and stone, and using it as fill onsite. Does this count under MRc3?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Our project has access to building materials that were delivered for another project, and never used because that project was canceled. If we use these materials can we count them here?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can crushed concrete, masonry or asphalt being reused onsite qualify as materials reuse?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |