Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "
Retail-NC-v4.1 LTc8: Electric Vehicles
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language

© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Provide charging infrastructure for electric vehicles for on-site parking.
Option 1. Electric Vehicle Supply Equipment (1 point)
Install electrical vehicle supply equipment (EVSE) in 5% of all parking spaces used by the project or at least two spaces, whichever is greater. Clearly identify and reserve these spaces for the sole use by plug-in electric vehicles. The EVSE must:- Provide a Level 2 charging capacity (208 – 240 volts) or greater for each required space.
- Comply with the relevant regional or local standard for electrical connectors, such as SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or IEC 62196 of the International Electrotechnical Commission for projects outside the U.S.
- Meet the connected functionality criteria for ENERGY STAR certified EVSE and be capable of responding to time-of-use market signals (e.g. price). Projects pursuing EA credit Grid Harmonization should incorporate EVSE into any demand response program or load flexibility and management strategies.
Option 2. Electric Vehicle Ready Infrastructure (1 point)
Make 10% of all parking spaces or at least 6 spaces EV Ready, whichever is greater. To be EV Ready, include a dedicated electrical circuit with sufficient capacity for each required space. Each circuit shall have conduit and wire sufficient to provide Level 2 charging or greater, and shall end at an electrical box or enclosure located near each required space. See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Addenda
Update criteria and titles for Options 1 and 2
In the heading for Option 1, after "Electric Vehicle" delete "Charging" and replace with "Supply Equipment"
Under Option 1, in the first sentence delete "2%" and replace with "5%"
For the first bulleted item after "EVSE must:" add "for each required space" after "(208 - 240 volts) or greater"
For the third bulleted item after "EVSE must:" add "Meet the connected functionality criteria for ENERGY STAR certified EVSE and" before "Be capable of responding to..."
In the heading for Option 2, after "Electric Vehicle" delete "Charging" and replace with "Ready"
Under Option 2, in the first sentence delete "6%" and replace with "10%"
After "To be EV Ready..." delete all language from "meet all of the following" to "future installation of the EVSE". Replace with the following language:
"include a dedicated electrical circuit with sufficient capacity for each required space. Each circuit shall have conduit and wire sufficient to provide Level 2 charging or greater, and shall end at an electrical box or enclosure located near each required space."
Under Reference Standards, delete the bullet item "ISO 15118, Road Vehicles - Vehicle to grid communications interface" and replace with "EPA ENERGY STAR Electric Vehicle Supply Equipment (EVSE) Key Product Criteria - Connected Functionality"
Under Definitions, delete the entire bullet item beginning "vehicle to grid (V2G)..." and replace with "connected functionality refers to EVSE that are capable of supporting building and/or utility demand response programs (ENERGY STAR EVSE Key Product Criteria)"
Under "The EVSE must:" revise the first sentence of the third bullet to read as "Be capable of responding to time-of-use market signals (e.g. price). "
Delete the last sentence of Option 2 which reads as: "A parking space with EVSE cannot also be counted as EV Ready. "
Revise "Make 6% of parking spaces or at least 6 spaces EV Ready."
TO
"Make 6% of parking spaces or at least 6 spaces, whichever is greater, EV Ready."
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language

© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Provide charging infrastructure for electric vehicles for on-site parking.
Option 1. Electric Vehicle Supply Equipment (1 point)
Install electrical vehicle supply equipment (EVSE) in 5% of all parking spaces used by the project or at least two spaces, whichever is greater. Clearly identify and reserve these spaces for the sole use by plug-in electric vehicles. The EVSE must:- Provide a Level 2 charging capacity (208 – 240 volts) or greater for each required space.
- Comply with the relevant regional or local standard for electrical connectors, such as SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or IEC 62196 of the International Electrotechnical Commission for projects outside the U.S.
- Meet the connected functionality criteria for ENERGY STAR certified EVSE and be capable of responding to time-of-use market signals (e.g. price). Projects pursuing EA credit Grid Harmonization should incorporate EVSE into any demand response program or load flexibility and management strategies.
Option 2. Electric Vehicle Ready Infrastructure (1 point)
Make 10% of all parking spaces or at least 6 spaces EV Ready, whichever is greater. To be EV Ready, include a dedicated electrical circuit with sufficient capacity for each required space. Each circuit shall have conduit and wire sufficient to provide Level 2 charging or greater, and shall end at an electrical box or enclosure located near each required space. See all forum discussions about this credit »Addenda
Revise the first sentence in the third bullet under "The EVSE must" to read as " Be vehicle to grid connected (e.g. ISO 15118 compliant) and capable of responding to time-of-use market signals (e.g. price). "
Update criteria and titles for Options 1 and 2
In the heading for Option 1, after "Electric Vehicle" delete "Charging" and replace with "Supply Equipment"
Under Option 1, in the first sentence delete "2%" and replace with "5%"
For the first bulleted item after "EVSE must:" add "for each required space" after "(208 - 240 volts) or greater"
For the third bulleted item after "EVSE must:" add "Meet the connected functionality criteria for ENERGY STAR certified EVSE and" before "Be capable of responding to..."
In the heading for Option 2, after "Electric Vehicle" delete "Charging" and replace with "Ready"
Under Option 2, in the first sentence delete "6%" and replace with "10%"
After "To be EV Ready..." delete all language from "meet all of the following" to "future installation of the EVSE". Replace with the following language:
"include a dedicated electrical circuit with sufficient capacity for each required space. Each circuit shall have conduit and wire sufficient to provide Level 2 charging or greater, and shall end at an electrical box or enclosure located near each required space."
Under Reference Standards, delete the bullet item "ISO 15118, Road Vehicles - Vehicle to grid communications interface" and replace with "EPA ENERGY STAR Electric Vehicle Supply Equipment (EVSE) Key Product Criteria - Connected Functionality"
Under Definitions, delete the entire bullet item beginning "vehicle to grid (V2G)..." and replace with "connected functionality refers to EVSE that are capable of supporting building and/or utility demand response programs (ENERGY STAR EVSE Key Product Criteria)"
Under "The EVSE must:" revise the first sentence of the third bullet to read as "Be capable of responding to time-of-use market signals (e.g. price). "
Delete the last sentence of Option 2 which reads as: "A parking space with EVSE cannot also be counted as EV Ready. "
Revise "Make 6% of parking spaces or at least 6 spaces EV Ready."
TO
"Make 6% of parking spaces or at least 6 spaces, whichever is greater, EV Ready."