Log in
LEED v2009
Retail – New construction
Sustainable Sites
Development density and community connectivity

LEED CREDIT

Retail-NC-v2009 SSc2: Development Density and Community Connectivity 5 points

See all forum discussions about this credit »

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Option 1: Development density
Construct or renovate a building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (13,800 square meters per hectare net). The density calculation is based on a typical two-story downtown development and must include the area of the project being built.

OR

Option 2: Community connectivity
Construct or renovate a building on a site that meets the following criteria:
  • Is located on a previously developed site
  • Is within 1/2 mile (800 meters) of a residential area or neighborhood with an average density of 10 units per acre net
  • Is within 1/2 mile (800 meters) of at least 10 basic services
  • Has pedestrian access between the building and the services
For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public. No more than 2 of the 10 services required may be anticipated (i.e. at least 8 must be existing and operational). In addition, the anticipated services must demonstrate that they will be operational in the locations indicated within 1 year of occupation of the applicant project. Examples of basic services include the following:
  • Bank
  • Place of Worship
  • Convenience Grocery
  • Day Care Center
  • Cleaners
  • Fire Station
  • Beauty Salon
  • Hardware
  • Laundry
  • Library
  • Medical or Dental Office
  • Senior Care Facility
  • Park
  • Pharmacy
  • Post Office
  • Restaurant
  • School
  • Supermarket
  • Theater
  • Community Center
  • Fitness Center
  • Museum
Proximity is determined by drawing a 1/2-mile (800 meter) radius around a main building entrance on a site map and counting the services within that radius. Greenfield developments and projects that do not use existing infrastructure are not eligible.
Streamlined path available
Achievement of this credit can be documented via a LEED ND v2009 submittal. For more information check out this article.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Option 1: Development density
Construct or renovate a building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (13,800 square meters per hectare net). The density calculation is based on a typical two-story downtown development and must include the area of the project being built.

OR

Option 2: Community connectivity
Construct or renovate a building on a site that meets the following criteria:
  • Is located on a previously developed site
  • Is within 1/2 mile (800 meters) of a residential area or neighborhood with an average density of 10 units per acre net
  • Is within 1/2 mile (800 meters) of at least 10 basic services
  • Has pedestrian access between the building and the services
For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public. No more than 2 of the 10 services required may be anticipated (i.e. at least 8 must be existing and operational). In addition, the anticipated services must demonstrate that they will be operational in the locations indicated within 1 year of occupation of the applicant project. Examples of basic services include the following:
  • Bank
  • Place of Worship
  • Convenience Grocery
  • Day Care Center
  • Cleaners
  • Fire Station
  • Beauty Salon
  • Hardware
  • Laundry
  • Library
  • Medical or Dental Office
  • Senior Care Facility
  • Park
  • Pharmacy
  • Post Office
  • Restaurant
  • School
  • Supermarket
  • Theater
  • Community Center
  • Fitness Center
  • Museum
Proximity is determined by drawing a 1/2-mile (800 meter) radius around a main building entrance on a site map and counting the services within that radius. Greenfield developments and projects that do not use existing infrastructure are not eligible.
Streamlined path available
Achievement of this credit can be documented via a LEED ND v2009 submittal. For more information check out this article.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Retail-NC-v2009 SSc2