Log in
LEED v4.1
Retail – Commercial Interiors
Materials and Resources
Storage and Collection of Recyclables

LEED CREDIT

Retail-CI-v4.1 MRp1: Storage and Collection of Recyclables Required

See all forum discussions about this credit »
View the LEED v4 version of this credit »

SPECIAL REPORT

LEEDuser expert

Jim Nicolow

FAIA, LEED Fellow

Lord Aeck Sargent
Director of Sustainability

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills.

Requirements

Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building. Collection and storage areas may be separate locations. Recyclable materials must include mixed paper, corrugated cardboard, glass, plastics, and metals. Take appropriate measures for the safe collection, storage, and disposal of two of the following: batteries, mercury-containing lamps, and electronic waste.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

4/9/2021Updated: 4/19/2021
Rating System Correction
Description of change:
Revise the below MR credit intents as follows:

MRp Storage and Collection of Recyclables
"To reduce the disproportionate burden of landfills and incinerators that is generated by building occupants’ waste hauled to and disposed of in landfills and incinerators through reduction, reuse and recycling service and education, and to conserve natural resources for future generations."

MRc Construction and Demolition Waste Management
"To reduce construction and demolition waste disposed of in landfills and incineration facilities through waste prevention and by reusing, recovering, and recycling materials, and conserving resources for future generations. To delay the need for new landfill facilities that are often located in frontline communities and create green jobs and materials markets for building construction services."
Campus Applicable
No
Internationally Applicable:
No
11/9/2020Updated: 3/1/2021
Rating System Correction
Description of change:
Add RETAIL to the list of adaptations

Under Requirements, delete all language following Retail NC/CI section:


Reference Guide updates:
Under Guidance for this credit for BDC and IDC, replace the following modifications for Retail:
There are no substantive changes to the prerequisite requirements; refer to the LEED v4 reference guide, with the following addition:
Beta Update
Retail projects should now follow guidance for New Construction/Commercial Interiors. Retail-specific requirements are no longer applicable.

Campus Applicable
No
Internationally Applicable:
No
11/9/2020Updated: 3/1/2021
Reference Guide Correction
Description of change:
Add RETAIL to the list of adaptations

Under Requirements, delete all language following Retail NC/CI section:


Reference Guide updates:
Under Guidance for this credit for BDC and IDC, replace the following modifications for Retail:
There are no substantive changes to the prerequisite requirements; refer to the LEED v4 reference guide, with the following addition:
Beta Update
Retail projects should now follow guidance for New Construction/Commercial Interiors. Retail-specific requirements are no longer applicable.

Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Jim Nicolow

FAIA, LEED Fellow

Lord Aeck Sargent
Director of Sustainability

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills.

Requirements

Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building. Collection and storage areas may be separate locations. Recyclable materials must include mixed paper, corrugated cardboard, glass, plastics, and metals. Take appropriate measures for the safe collection, storage, and disposal of two of the following: batteries, mercury-containing lamps, and electronic waste.

LEEDuser expert

Jim Nicolow

FAIA, LEED Fellow

Lord Aeck Sargent
Director of Sustainability

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Retail-CI-v4.1 MRp1