Credit achievement rate
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Public transportation access (6 points)
Path 1. Rail station, bus rapid transit station & ferry terminal proximity
Locate the project within 1/2-mile (800 meters) walking distance (measured from a main building entrance) of an existing or planned and funded commuter rail, light rail, subway station bus rapid transit1 station or commuter ferry terminal.OR
Path 2. Bus stop proximity
Locate the project within 1/4-mile (400 meters) walking distance (measured from a main building entrance) of 1 or more stops for 2 or more public, campus, or private bus lines usable by tenant space occupants.OR
Path 3. Rideshare proximity
Projects outside the U.S. may locate the project within 1/4-mile (400 meter) walking distance (measured from a main building entrance) of 1 or more stops for 2 or more existing rideshare options2 that that meet the definition of public transportation3 and are authorized by the local transit authority if one exists.Option 2. Bicycle commuting (1 point)
Provide secure bicycle racks and/or storage within 200 yards of a building entrance according to the following guidelines based on project square footage:- Up to 5,000 sf (465 square meters), 2 or more bicycle racks
- 5,001–20,000 sf (466-1,860 square meters), 3 or more bicycle racks
- 20,001–50,000 sf (1,861-4,600 square meters), 6 or more bicycle racks
- More than 50,000 sf (4,600 square meters), 10 or more bicycle racks
For projects that are part of a multitenant complex
A multitenant complex is a master-planned development of stores, restaurants, and other businesses; retailers may share one or more services and/or common areas. If bicycle racks have been provided by the development in which the project is located, the number that may be attributed to the project is determined by taking the square footage of the retail project and dividing by the total square footage of the development (buildings only). Multiply the resulting percentage by the total number of bicycle racks. If this number does not meet the credit requirement, the project should add additional spaces.Option 3. Low-emitting and fuel-efficient vehicles
Path 1. Provide vehicles
Provide low-emitting and fuel-efficient vehicles4 for 3% of the full-time equivalent (FTE) occupants. Provide preferred parking5 for these vehicles.OR
Path 2. Preferred or discounted parking
Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of the total employee parking and 5% of customer parking provided for the project.OR
Path 3. Alternative fuel
Install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the site. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.OR
Path 4. Vehicle sharing program
Provide building occupants access to a low-emitting or fuel-efficient vehicle-sharing program. The following requirements must be met:- One low-emitting or fuel-efficient vehicle must be provided for a minimum 3% of employee FTE occupants. Assuming that 1 shared vehicle can carry 8 persons, 1 vehicle per 267 employee FTE occupants is required. For buildings with fewer than 267 employee FTE occupants, at least 1 low‑emitting or fuel-efficient vehicle must be provided.
- A vehicle-sharing contract must be provided that has an agreement of at least 2 years.
- The estimated number of riders served per vehicle must be supported by documentation.
- A narrative explaining the vehicle-sharing program and its administration must be submitted.
- Parking for low-emitting and fuel-efficient vehicles must be located in the nearest SS Credit 3 available spaces in the nearest available parking area. Provide a site plan or area map clearly highlighting the walking path from the parking area to the project site and noting the distance.
- Transit pass subsidies.
- Purchase of public transportation passes on a pretax basis.
- Preferred scheduling for carpoolers. While shifts cannot be guaranteed, a reasonable effort will be made to accommodate carpooling employees’ schedules.
- An "emergency ride home” program for carpoolers and vanpoolers who must leave work unexpectedly.
- Preferred parking for carpools or vanpools.
- Discounts on bicycle accessories and maintenance at local shops.
- Information on carpooling programs.
- Transit trip planning assistance.
- Transit maps.
- Maps of bicycle routes and the locations of secure bicycle parking, lockers, and showers, if provided.
- Summary of the company transportation management plan.
- Contacts for more information.
Option 4. Parking availability
Case 1. Projects with an area less than 75% of the total building area
Path 1 - Zoning requirements will not be exceeded
Parking spaces provided to tenant must meet but not exceed minimum number required by local zoning regulations. Preferred parking must be provided for carpools or vanpools capable of serving 5% or more of tenant employees.OR
Path 2: No new parking
No parking will be provided or subsidized for tenant employees.Case 2. Projects with an area 75% or more of the total building area
Preferred parking must be provided for carpools or vanpools, capable of serving 5% of the building employees.AND
Path 1 - Zoning requirements will not be exceeded
Parking capacity must meet but not exceed minimum local zoning requirements. Preferred parking must be provided for carpools or vanpools, capable of serving 5% of the building employees.OR
Path 2: No new parking
No new parking will be added for rehabilitation projects.Option 5: Delivery service (1 point)
Provide a delivery service for purchases made from the retail establishment. It is not required that the delivery service be free of charge, but the cost should not be prohibitive.Option 6: Incentives (1 point)
Provide a comprehensive incentives program for employees who carpool or use alternative transportation to get to work. Three incentives must be provided for all staff upon hire. Potential incentives may include but are not limited to the following:Option 7: Alternative transportation education (1 point)
Provide a board or computer display in the retail project, accessible to both employees and customers, that provides the following information:1For the purposes of this credit “preferred parking” refers to the parking spots that are closest to the main entrance of the project (exclusive of spaces designated for handicapped persons) or parking passes provided at a discounted price. To establish a meaningful incentive in all potential markets, the parking rate must be discounted at least 20%. The discounted rate must be available to all eligible customers (i.e. not limited to the number of customers equal to 5% of the vehicle parking capacity), publicly posted at the entrance of the parking area, and available for a minimum of 2 years.2For the purposes of this credit, low-emitting vehicles are defined as vehicles that are classified as Zero Emission Vehicles (ZEV) by the California Air Resources Board. Fuel-efficient vehicles are defined as vehicles that have achieved a minimum green score of 40 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide [Europe ACP: Low-Emitting and Fuel-Efficient Vehicles] [South America ACP: Low-Emitting and Fuel-Efficient Vehicles].
Alternative Compliance Paths (ACPs)
Europe ACP: Low-Emitting and Fuel-Efficient Vehicles
Projects in Europe may use vehicles meeting the Euro 6 limit values of Regulation (EC) No. 715/2007.[view:embed_resource=page_1=4887984]Europe ACP: Low-Emitting and Fuel-Efficient Vehicles
Projects in Europe may use vehicles meeting the Euro 6 limit values of Regulation (EC) No. 715/2007.[view:embed_resource=page_1=4908190]South America ACP: Green Vehicles
Vehicles in South America may qualify as green vehicles by meeting both of the following conditions:- A score of Four Stars or above from IBAMA (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis - Brazilian Institute of Environment and Renewable Natural Resources) Nota Verde Program.
- An A from INMETRO (Instituto Nacional de Metrologia, Qualidade e Tecnologia - National Institute of Metrology, Quality and Technology) Brazilian Labeling Program for Vehicles.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Public transportation access (6 points)
Path 1. Rail station, bus rapid transit station & ferry terminal proximity
Locate the project within 1/2-mile (800 meters) walking distance (measured from a main building entrance) of an existing or planned and funded commuter rail, light rail, subway station bus rapid transit1 station or commuter ferry terminal.OR
Path 2. Bus stop proximity
Locate the project within 1/4-mile (400 meters) walking distance (measured from a main building entrance) of 1 or more stops for 2 or more public, campus, or private bus lines usable by tenant space occupants.OR
Path 3. Rideshare proximity
Projects outside the U.S. may locate the project within 1/4-mile (400 meter) walking distance (measured from a main building entrance) of 1 or more stops for 2 or more existing rideshare options2 that that meet the definition of public transportation3 and are authorized by the local transit authority if one exists.Option 2. Bicycle commuting (1 point)
Provide secure bicycle racks and/or storage within 200 yards of a building entrance according to the following guidelines based on project square footage:- Up to 5,000 sf (465 square meters), 2 or more bicycle racks
- 5,001–20,000 sf (466-1,860 square meters), 3 or more bicycle racks
- 20,001–50,000 sf (1,861-4,600 square meters), 6 or more bicycle racks
- More than 50,000 sf (4,600 square meters), 10 or more bicycle racks
For projects that are part of a multitenant complex
A multitenant complex is a master-planned development of stores, restaurants, and other businesses; retailers may share one or more services and/or common areas. If bicycle racks have been provided by the development in which the project is located, the number that may be attributed to the project is determined by taking the square footage of the retail project and dividing by the total square footage of the development (buildings only). Multiply the resulting percentage by the total number of bicycle racks. If this number does not meet the credit requirement, the project should add additional spaces.Option 3. Low-emitting and fuel-efficient vehicles
Path 1. Provide vehicles
Provide low-emitting and fuel-efficient vehicles4 for 3% of the full-time equivalent (FTE) occupants. Provide preferred parking5 for these vehicles.OR
Path 2. Preferred or discounted parking
Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of the total employee parking and 5% of customer parking provided for the project.OR
Path 3. Alternative fuel
Install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the site. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.OR
Path 4. Vehicle sharing program
Provide building occupants access to a low-emitting or fuel-efficient vehicle-sharing program. The following requirements must be met:- One low-emitting or fuel-efficient vehicle must be provided for a minimum 3% of employee FTE occupants. Assuming that 1 shared vehicle can carry 8 persons, 1 vehicle per 267 employee FTE occupants is required. For buildings with fewer than 267 employee FTE occupants, at least 1 low‑emitting or fuel-efficient vehicle must be provided.
- A vehicle-sharing contract must be provided that has an agreement of at least 2 years.
- The estimated number of riders served per vehicle must be supported by documentation.
- A narrative explaining the vehicle-sharing program and its administration must be submitted.
- Parking for low-emitting and fuel-efficient vehicles must be located in the nearest SS Credit 3 available spaces in the nearest available parking area. Provide a site plan or area map clearly highlighting the walking path from the parking area to the project site and noting the distance.
- Transit pass subsidies.
- Purchase of public transportation passes on a pretax basis.
- Preferred scheduling for carpoolers. While shifts cannot be guaranteed, a reasonable effort will be made to accommodate carpooling employees’ schedules.
- An "emergency ride home” program for carpoolers and vanpoolers who must leave work unexpectedly.
- Preferred parking for carpools or vanpools.
- Discounts on bicycle accessories and maintenance at local shops.
- Information on carpooling programs.
- Transit trip planning assistance.
- Transit maps.
- Maps of bicycle routes and the locations of secure bicycle parking, lockers, and showers, if provided.
- Summary of the company transportation management plan.
- Contacts for more information.
Option 4. Parking availability
Case 1. Projects with an area less than 75% of the total building area
Path 1 - Zoning requirements will not be exceeded
Parking spaces provided to tenant must meet but not exceed minimum number required by local zoning regulations. Preferred parking must be provided for carpools or vanpools capable of serving 5% or more of tenant employees.OR
Path 2: No new parking
No parking will be provided or subsidized for tenant employees.Case 2. Projects with an area 75% or more of the total building area
Preferred parking must be provided for carpools or vanpools, capable of serving 5% of the building employees.AND
Path 1 - Zoning requirements will not be exceeded
Parking capacity must meet but not exceed minimum local zoning requirements. Preferred parking must be provided for carpools or vanpools, capable of serving 5% of the building employees.OR
Path 2: No new parking
No new parking will be added for rehabilitation projects.Option 5: Delivery service (1 point)
Provide a delivery service for purchases made from the retail establishment. It is not required that the delivery service be free of charge, but the cost should not be prohibitive.Option 6: Incentives (1 point)
Provide a comprehensive incentives program for employees who carpool or use alternative transportation to get to work. Three incentives must be provided for all staff upon hire. Potential incentives may include but are not limited to the following:Option 7: Alternative transportation education (1 point)
Provide a board or computer display in the retail project, accessible to both employees and customers, that provides the following information:1For the purposes of this credit “preferred parking” refers to the parking spots that are closest to the main entrance of the project (exclusive of spaces designated for handicapped persons) or parking passes provided at a discounted price. To establish a meaningful incentive in all potential markets, the parking rate must be discounted at least 20%. The discounted rate must be available to all eligible customers (i.e. not limited to the number of customers equal to 5% of the vehicle parking capacity), publicly posted at the entrance of the parking area, and available for a minimum of 2 years.2For the purposes of this credit, low-emitting vehicles are defined as vehicles that are classified as Zero Emission Vehicles (ZEV) by the California Air Resources Board. Fuel-efficient vehicles are defined as vehicles that have achieved a minimum green score of 40 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide [Europe ACP: Low-Emitting and Fuel-Efficient Vehicles] [South America ACP: Low-Emitting and Fuel-Efficient Vehicles].
Alternative Compliance Paths (ACPs)
Europe ACP: Low-Emitting and Fuel-Efficient Vehicles
Projects in Europe may use vehicles meeting the Euro 6 limit values of Regulation (EC) No. 715/2007.[view:embed_resource=page_1=4887984]Europe ACP: Low-Emitting and Fuel-Efficient Vehicles
Projects in Europe may use vehicles meeting the Euro 6 limit values of Regulation (EC) No. 715/2007.[view:embed_resource=page_1=4908190]South America ACP: Green Vehicles
Vehicles in South America may qualify as green vehicles by meeting both of the following conditions:- A score of Four Stars or above from IBAMA (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis - Brazilian Institute of Environment and Renewable Natural Resources) Nota Verde Program.
- An A from INMETRO (Instituto Nacional de Metrologia, Qualidade e Tecnologia - National Institute of Metrology, Quality and Technology) Brazilian Labeling Program for Vehicles.
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »