Retail-CI-v2009 EAp1: Fundamental Commissioning of Building Energy Systems Required

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $39 »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

The following commissioning process activities must be completed by the project team:

  • Designate an individual as the commissioning authority (CxA) to lead, review, and oversee the completion of the commissioning process activities.
    • The CxA must have documented commissioning authority experience in at least 2 building projects.
    • The individual serving as the CxA must be independent of the project’s design and construction management, though the CxA may be an employee of any firm providing those services. The CxA may be a qualified employee or consultant of the owner.
    • The CxA must report results, findings, and recommendations directly to the owner.
    • For projects smaller than 50,000 gross square feet (4,600 gross square meters), the CxA may be a qualified person on the design or construction team who has the required experience.
  • The owner must document the owner’s project requirements. The design team must develop the basis of design. The CxA must review these documents for clarity and completeness. The owner and design team must be responsible for updates to their respective documents.
  • Develop and incorporate commissioning requirements into the construction documents.
  • Develop and implement a commissioning plan.
  • Verify the installation and performance of the systems to be commissioned.
  • Complete a summary commissioning report.
Commissioned Systems
Commissioning process activities must be completed for the following energy-related systems, at a minimum:
  • Heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems (mechanical and passive) and associated controls.
  • Lighting and daylighting controls.
  • Domestic hot water systems.
  • Renewable energy systems (e.g., photovoltaic, wind, solar).
Credit substitution available
You may use the LEED v4 version of this credit on v2009 projects. For more information check out this article.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $39 »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $39 »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $39 »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

The following commissioning process activities must be completed by the project team:

  • Designate an individual as the commissioning authority (CxA) to lead, review, and oversee the completion of the commissioning process activities.
    • The CxA must have documented commissioning authority experience in at least 2 building projects.
    • The individual serving as the CxA must be independent of the project’s design and construction management, though the CxA may be an employee of any firm providing those services. The CxA may be a qualified employee or consultant of the owner.
    • The CxA must report results, findings, and recommendations directly to the owner.
    • For projects smaller than 50,000 gross square feet (4,600 gross square meters), the CxA may be a qualified person on the design or construction team who has the required experience.
  • The owner must document the owner’s project requirements. The design team must develop the basis of design. The CxA must review these documents for clarity and completeness. The owner and design team must be responsible for updates to their respective documents.
  • Develop and incorporate commissioning requirements into the construction documents.
  • Develop and implement a commissioning plan.
  • Verify the installation and performance of the systems to be commissioned.
  • Complete a summary commissioning report.
Commissioned Systems
Commissioning process activities must be completed for the following energy-related systems, at a minimum:
  • Heating, ventilating, air-conditioning, and refrigeration (HVAC&R) systems (mechanical and passive) and associated controls.
  • Lighting and daylighting controls.
  • Domestic hot water systems.
  • Renewable energy systems (e.g., photovoltaic, wind, solar).
Credit substitution available
You may use the LEED v4 version of this credit on v2009 projects. For more information check out this article.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Retail-CI-v2009 EAp1