Requirements

To protect life and property, promote open space and habitat conservation, and enhance water quality and natural hydrological systems.

Case 1. Sites without flood hazard areas

Locate on a site that is entirely outside any flood hazard area shown on a legally adopted flood hazard map or otherwise legally designated by the local jurisdiction or the state. For projects in places without legally adopted flood hazard maps or legal designations, locate on a site that is entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year.

Case 2. Infill or previously developed sites with flood hazard areas

Locate the project on an infill site or a previously developed site and select one of the following two options.

Option 1. American Society of Civil Engineers standard

For any portion of the site within the flood hazard area, design buildings in accordance with American Society of Civil Engineers Standard 24-05 (ASCE 24).

If the project includes construction of a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the floodwater levels specified in ASCE 24, or at the water levels represented by a 0.2% annual chance (500-year) flood, whichever is higher. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

OR

Option 2. National Flood Insurance Program

For any portion of the site within the flood hazard area, design buildings in accordance with National Flood Insurance Program (NFIP) requirements. Projects outside the U.S. may use a local equivalent to NFIP as long the program is equal to or more stringent than NFIP and is administered at the national level.

If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the water levels represented by a 0.2% annual chance (500-year) flood. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

Case 3. All other sites with flood hazard areas

Meet the requirements of one of the following two options.

Option 1. American Society of Civil Engineers standard

Previously developed portions of the site
On portions of the site that are previously developed and in the flood hazard area, design buildings in accordance with American Society of Civil Engineers Standard 24-05 (ASCE 24).

Nonpreviously developed portions of the site
On portions of the site that are not previously developed and in the flood hazard area, do not develop on land that is within either a regulatory floodway or a coastal high hazard area (Zone V), as shown on the flood hazard map.

On all other portions of the site that are not previously developed and in the flood hazard area, design buildings in accordance with ASCE 24.

Critical facilities in the flood hazard area
If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the floodwater levels specified in ASCE 24 or at the water levels represented by a 0.2% annual chance (500-year) flood, whichever is higher. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

OR

Option 2. National Flood Insurance Program

Previously developed portions of the site
On portions of the site that are previously developed and in the flood hazard area, design buildings in accordance with National Flood Insurance Program (NFIP) requirements. Project outside of the U.S. may use a local equivalent program to NFIP if the program is equal to or more stringent than NFIP and is administered at the national level.

Nonpreviously developed portions of the site
On portions of the site that are not previously developed and in the flood hazard area, do not develop on land that is within either a regulatory floodway or a coastal high hazard area (Zone V), as shown on the flood hazard map.

On all other portions of the site that are not previously developed and in the flood hazard area, design buildings in accordance with NFIP.

Critical facilities in the flood hazard area
If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the water levels represented by a 0.2% annual chance (500-year) flood. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

To protect life and property, promote open space and habitat conservation, and enhance water quality and natural hydrological systems.

Case 1. Sites without flood hazard areas

Locate on a site that is entirely outside any flood hazard area shown on a legally adopted flood hazard map or otherwise legally designated by the local jurisdiction or the state. For projects in places without legally adopted flood hazard maps or legal designations, locate on a site that is entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year.

Case 2. Infill or previously developed sites with flood hazard areas

Locate the project on an infill site or a previously developed site and select one of the following two options.

Option 1. American Society of Civil Engineers standard

For any portion of the site within the flood hazard area, design buildings in accordance with American Society of Civil Engineers Standard 24-05 (ASCE 24).

If the project includes construction of a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the floodwater levels specified in ASCE 24, or at the water levels represented by a 0.2% annual chance (500-year) flood, whichever is higher. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

OR

Option 2. National Flood Insurance Program

For any portion of the site within the flood hazard area, design buildings in accordance with National Flood Insurance Program (NFIP) requirements. Projects outside the U.S. may use a local equivalent to NFIP as long the program is equal to or more stringent than NFIP and is administered at the national level.

If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the water levels represented by a 0.2% annual chance (500-year) flood. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

Case 3. All other sites with flood hazard areas

Meet the requirements of one of the following two options.

Option 1. American Society of Civil Engineers standard

Previously developed portions of the site
On portions of the site that are previously developed and in the flood hazard area, design buildings in accordance with American Society of Civil Engineers Standard 24-05 (ASCE 24).

Nonpreviously developed portions of the site
On portions of the site that are not previously developed and in the flood hazard area, do not develop on land that is within either a regulatory floodway or a coastal high hazard area (Zone V), as shown on the flood hazard map.

On all other portions of the site that are not previously developed and in the flood hazard area, design buildings in accordance with ASCE 24.

Critical facilities in the flood hazard area
If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the floodwater levels specified in ASCE 24 or at the water levels represented by a 0.2% annual chance (500-year) flood, whichever is higher. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.

OR

Option 2. National Flood Insurance Program

Previously developed portions of the site
On portions of the site that are previously developed and in the flood hazard area, design buildings in accordance with National Flood Insurance Program (NFIP) requirements. Project outside of the U.S. may use a local equivalent program to NFIP if the program is equal to or more stringent than NFIP and is administered at the national level.

Nonpreviously developed portions of the site
On portions of the site that are not previously developed and in the flood hazard area, do not develop on land that is within either a regulatory floodway or a coastal high hazard area (Zone V), as shown on the flood hazard map.

On all other portions of the site that are not previously developed and in the flood hazard area, design buildings in accordance with NFIP.

Critical facilities in the flood hazard area
If the project involves a critical facility that is intended to remain operational in the event of a flood, or whose function is critical for postflood recovery, design the facility to be protected and operable at the water levels represented by a 0.2% annual chance (500-year) flood. For the purpose of this requirement, critical facilities include, but are not limited to, hospitals, emergency operations centers, building or portions of buildings designated as emergency shelters, water and sewage treatment facilities, and fire and police stations.