LEED CREDIT

ND-v4 NPDc3: Mixed-use neighborhoods 1-4 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Locate or design the project such that 50% of its dwelling units are within a 1/4-mile (400-meter) walking distance of the number of uses (see Appendix 1) listed in Table 1. For projects with no dwelling units, 50% of dwelling units within a 1/4-mile (400-meter) walking distance of the project boundary must be within a 1/4-mile (400-meter) walking distance of the number of uses within the project specified in Table 1. The specified number of uses must be in place by the time of 50% occupancy of total building floor area (exclusive of portions of parking structures devoted to parking).

Table 1. Points for uses within 1/4-mile (400-meter) walking distance, by percentage of occupancy

Diverse uses

Points

4–7

1

8–11

2

12–19

3

≥ 20

4

The following restrictions apply.
  • A use may be counted as only one use type (e.g., a retail store may be counted only once even if it sells products in several categories).
  • No more than two uses in each use type may be counted (e.g., if five restaurants are within the required distance, only two may be counted).
  • The uses accessible to each counted dwelling unit must represent at least two categories.
For projects with regional-serving retail of 150,000 or more square feet (13 935 square meters) only Additionally, a project that has at least one large retail use (defined as a use totaling 75,000 or more square feet [7000 or more square meters]), must also meet at least the 2-point threshold for transit service under SLL Credit Access to Quality Transit. In this case, planned transit service can be counted. Each large retail use must be served by at least one transit stop providing trips that qualify under that SLL Credit. If transit service is planned but not yet operational, the project must demonstrate one of the following:
  1. The relevant transit agency has a signed full-funding grant agreement with the Federal Transit Administration (or equivalent national agency for projects outside of the U.S.) that includes a revenue operations date for the start of transit service. The revenue operations date must be no later than the day by which 50% of the project’s total building floor area will be occupied.
  2. For bus, streetcar, bus rapid transit, or ferry service, the transit agency must certify that it has an approved budget that includes specifically allocated funds sufficient to provide the planned service at the levels listed above and that service at these levels will begin no later than the day by which 50% of the project’s total building floor area will be occupied.
  3. For rail service other than streetcars, the transit agency must certify that preliminary engineering for a rail line has begun. In addition, the service must meet either of these two requirements:
    • A state legislature or local subdivision of the state (or local government for projects outside the U.S.) has authorized the transit agency to expend funds to establish rail transit service that will begin no later than the date by which 50% of the project’s total building floor area will be occupied.
    • OR
    • A local government has dedicated funding or reimbursement commitments from future tax revenue for the development of stations, platforms, or other rail transit infrastructure that will serve the project no later than the date by which 50% of the project’s total building floor area will be occupied.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

7/2/2018Updated: 7/3/2018
Reference Guide Correction
Description of change:
Revise the second bullet to read as follows:

"Ensure that no more than two uses within each use type are counted for each dwelling unit."
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Locate or design the project such that 50% of its dwelling units are within a 1/4-mile (400-meter) walking distance of the number of uses (see Appendix 1) listed in Table 1. For projects with no dwelling units, 50% of dwelling units within a 1/4-mile (400-meter) walking distance of the project boundary must be within a 1/4-mile (400-meter) walking distance of the number of uses within the project specified in Table 1. The specified number of uses must be in place by the time of 50% occupancy of total building floor area (exclusive of portions of parking structures devoted to parking).

Table 1. Points for uses within 1/4-mile (400-meter) walking distance, by percentage of occupancy

Diverse uses

Points

4–7

1

8–11

2

12–19

3

≥ 20

4

The following restrictions apply.
  • A use may be counted as only one use type (e.g., a retail store may be counted only once even if it sells products in several categories).
  • No more than two uses in each use type may be counted (e.g., if five restaurants are within the required distance, only two may be counted).
  • The uses accessible to each counted dwelling unit must represent at least two categories.
For projects with regional-serving retail of 150,000 or more square feet (13 935 square meters) only Additionally, a project that has at least one large retail use (defined as a use totaling 75,000 or more square feet [7000 or more square meters]), must also meet at least the 2-point threshold for transit service under SLL Credit Access to Quality Transit. In this case, planned transit service can be counted. Each large retail use must be served by at least one transit stop providing trips that qualify under that SLL Credit. If transit service is planned but not yet operational, the project must demonstrate one of the following:
  1. The relevant transit agency has a signed full-funding grant agreement with the Federal Transit Administration (or equivalent national agency for projects outside of the U.S.) that includes a revenue operations date for the start of transit service. The revenue operations date must be no later than the day by which 50% of the project’s total building floor area will be occupied.
  2. For bus, streetcar, bus rapid transit, or ferry service, the transit agency must certify that it has an approved budget that includes specifically allocated funds sufficient to provide the planned service at the levels listed above and that service at these levels will begin no later than the day by which 50% of the project’s total building floor area will be occupied.
  3. For rail service other than streetcars, the transit agency must certify that preliminary engineering for a rail line has begun. In addition, the service must meet either of these two requirements:
    • A state legislature or local subdivision of the state (or local government for projects outside the U.S.) has authorized the transit agency to expend funds to establish rail transit service that will begin no later than the date by which 50% of the project’s total building floor area will be occupied.
    • OR
    • A local government has dedicated funding or reimbursement commitments from future tax revenue for the development of stations, platforms, or other rail transit infrastructure that will serve the project no later than the date by which 50% of the project’s total building floor area will be occupied.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about ND-v4 NPDc3