LEEDuser’s viewpoint
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
A project may earn a maximum of 12 points according to the schedule in Table 1:
Items achieved |
Points |
2–3 |
1 |
4–5 |
2 |
6–7 |
3 |
8–9 |
4 |
10 |
7 |
11 |
8 |
12 |
9 |
13 |
10 |
14 |
11 |
15–16 |
12 |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
Add the following metric conversions:
"(15 meters)" after all instances of "50 feet"
"(300 millimeters)" after"1 foot"
" or 900 millimeters" after"3 feet" and "(meters)" after "feet"
"(2.5 meters)" after "8 feet"
"(1.2 meters)" after "4 feet"
Section b. Forth bullet delete the following statement: "Building height is measured to eaves or the top of the roof for a flat-roof structure, and street width is measured façade to façade."
Add : "(or a local equivalent for projects outside the U.S.)" after the National Register of Historic Places or National Park Service
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
A project may earn a maximum of 12 points according to the schedule in Table 1:
Items achieved |
Points |
2–3 |
1 |
4–5 |
2 |
6–7 |
3 |
8–9 |
4 |
10 |
7 |
11 |
8 |
12 |
9 |
13 |
10 |
14 |
11 |
15–16 |
12 |