Log in
LEED v2009
Neighborhood Development
Introduction/Other

LEED CREDIT

ND-v2009 Introduction/Other: Introduction/Other

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

2/2/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
In the third line, remove the text "(up to 20% of total intersections)"
Campus Applicable
No
Internationally Applicable:
No
4/1/2012Updated: 2/14/2015
Rating System Correction
Description of change:
Remove the extra "s" in "isssued"
Campus Applicable
No
Internationally Applicable:
No
4/14/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
Replace the image
Campus Applicable
No
Internationally Applicable:
No
2/2/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
At the end of the term\'s first sentence, insert the text "(see USDOE EIA CBECS survey for suggested default nonresidential occupancies)"
Campus Applicable
No
Internationally Applicable:
No
8/1/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
In alphabetical order, add the term "An appurtenance is any built-in, nonstructural portion of a roof system, such as skylights, ventilators, mechanical equipment, partitions, and solar energy panels."
Campus Applicable
No
Internationally Applicable:
No
7/19/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
In "3 years after build-out" section, change the period at the end of the second line to a semicolon and add a new line with the text "NPDc8 TDM program funding commitment."
Campus Applicable
No
Internationally Applicable:
No
8/1/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
In alphabetical order, add the term "Gross floor area (based on ASHRAE definition) is the sum
Campus Applicable
No
Internationally Applicable:
No
11/1/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
Remove the row for Green Infrastructure and Buildings, Prerequisite 3, Connected and Open Community
Campus Applicable
No
Internationally Applicable:
No
10/1/2012Updated: 2/14/2015
Reference Guide Correction
Description of change:
Replace the definition of "cul-de-sac" with "a segment of the circulation network that terminates without intersecting another segment of the circulation network."
Campus Applicable
No
Internationally Applicable:
No
4/1/2012Updated: 2/14/2015
Reference Guide Correction
Description of change:
Remove the extra "s" in "isssued"
Campus Applicable
No
Internationally Applicable:
No
7/19/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
In "3 years after first bldg occupancy" section, replace sentence with "Subsidized transit passes provided."
Campus Applicable
No
Internationally Applicable:
No
2/2/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
In the third line of the term "Connectivity," remove the text "(up to 20% of total intersections)"
Campus Applicable
No
Internationally Applicable:
No
7/19/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
Remove the "80% occupancy" section
Campus Applicable
No
Internationally Applicable:
No
11/3/2010Updated: 2/14/2015
Reference Guide Correction
Description of change:
Below the paragraph,add the following section:Units of Measurement GuidanceIn order to facilitate certification review by U.S.-based reviewers, it is necessary to submit pertinent aspects of review-related documentation in English and convert units to U.S. Standard (i.e. Imperial) units of measure, unless noted otherwise in the credit or prerequisite description. It is not necessary to translate every aspect of every construction document into English and imperial units, but only those necessary for evaluation of LEED criteria. The project team should be prepared to provide additional translation(s) if requested by the reviewer in their preliminary review comments.
Campus Applicable
No
Internationally Applicable:
No
8/1/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
In alphabetical order, add the term, "Roof area is the area of the uppermost surface of the building which covers enclosed Gross Floor Area, as measured when projected onto a flat, horizontal surface (i.e. as seen in Roof Plan view). \'Roofs\', or portions of roofs, covering unenclosed areas (e.g. roofs over porches and open covered parking structures) are not included in the areas used to evaluate compliance with roof measures in Options 2 and 3, though they may be applicable to nonroof measures in Options 1 and 3."
Campus Applicable
No
Internationally Applicable:
No
2/2/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
Insert the term "major renovations" in alphabetical order with the accompanying text "major renovations extensive alteration work in addition to work on the exterior shell of the building and/or primary structural components and/or the core and peripheral MEP and service systems and/or site work. Typically, the extent and nature of the work is such that the primary function space cannot be used for its intended purpose while the work is in progress and where a new certificate of occupancy is required before the work area can be re-occupied."
Campus Applicable
No
Internationally Applicable:
No
10/1/2012Updated: 2/14/2015
Reference Guide Correction
Description of change:
Revise connecitivity definition to the following: connectivity the number of publicly accessible intersections per square mile, including any combination of streets, dedicated alleys, transit rights-of-way, and nonmotorized rights-of-way. If one must both enter and exit an area through the same intersection, such an intersection and any intersections beyond that point are not counted; intersections leading only to culs-de-sac are also not counted. The calculation of square mileage excludes water bodies, parks larger than 1/2 acre, public facility campuses, airports, rail yards, slopes over 15%, and areas nonbuildable under codified law or the rating system. Street rights-of-way may not be excluded.
Campus Applicable
No
Internationally Applicable:
No
4/1/2012Updated: 2/14/2015
Reference Guide Correction
Description of change:
Revise the definition for "existing" to read, "existing present on the date of submission of the first LEED-ND certification documents; similarly, an element or condition that exists is present on the date that LEED-ND certification documents are submitted. Elements or conditions created as part of the LEED-ND project are not considered existing."
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.