Requirements
Option 1. Project with affordable residential component (3 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate or design the project such that its geographic center (or boundary if the project exceeds 500 acres [200 hectares]) is within a ½-mile (800-meter) walking distance of existing full-time equivalent jobs whose number equals or exceeds the number of dwelling units in the project. Satisfy the requirements necessary to earn at least 1 point under NPDc4 Housing Types and Affordability, Option 2, Affordable Housing.OR
Option 2. Project with residential component (2 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures) and locate or design the project such that its geographic center (or boundary if the project exceeds 500 acres [200 hectares]) is within a ½-mile (800-meter) walking distance of existing full-time equivalent jobs whose number equals or exceeds the number of dwelling units in the project.OR
Option 3. Infill Project with nonresidential component (1 point)
Include a nonresidential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures) and locate on an infill site whose geographic center (or boundary if the project exceeds 500 acres [200 hectares]) is within a ½-mile (800-meter) walking distance of an existing rail transit, ferry, or tram stop and within a ½-mile (800-meter) walking distance of existing dwelling units whose number equals or exceeds 50% of the number of new full-time equivalent jobs located in the project. See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Project with affordable residential component (3 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate or design the project such that its geographic center (or boundary if the project exceeds 500 acres [200 hectares]) is within a ½-mile (800-meter) walking distance of existing full-time equivalent jobs whose number equals or exceeds the number of dwelling units in the project. Satisfy the requirements necessary to earn at least 1 point under NPDc4 Housing Types and Affordability, Option 2, Affordable Housing.OR
Option 2. Project with residential component (2 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures) and locate or design the project such that its geographic center (or boundary if the project exceeds 500 acres [200 hectares]) is within a ½-mile (800-meter) walking distance of existing full-time equivalent jobs whose number equals or exceeds the number of dwelling units in the project.OR