ND-Plan-v4 SLLc3: Access to quality transit 1-7 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Locate the project on a site with existing transit service such that at least 50% of dwelling units and nonresidential use entrances (inclusive of existing buildings) are within a ¼-mile (400-meter) walking distance of bus, streetcar, or rideshare stops or within a ½-mile (800-meter) walking distance of bus rapid transit stops, light or heavy rail stations, commuter rail stations or ferry terminals, and the transit service at those stops in aggregate meets the minimums listed in Tables 1 and 2. Projects must meet the requirements for both weekday and weekend trips and provide service every day.

Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry).

Weekday trips

Weekend trips

Points

60

40

1

76

50

2

100

65

3

132

85

4

180

130

5

246

150

6

320

200

7

Table 2. Minimum daily transit service for projects with commuter rail or ferry service only

Weekday trips

Weekend trips

Points

24

6

1

40

8

2

60

12

3

Projects served by two or more transit routes such that no one route provides more than 60% of the prescribed levels may earn an additional point, up to the maximum 7 points. If existing transit service is temporarily rerouted outside the required distances for less than two years, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Locate the project on a site with existing transit service such that at least 50% of dwelling units and nonresidential use entrances (inclusive of existing buildings) are within a ¼-mile (400-meter) walking distance of bus, streetcar, or rideshare stops or within a ½-mile (800-meter) walking distance of bus rapid transit stops, light or heavy rail stations, commuter rail stations or ferry terminals, and the transit service at those stops in aggregate meets the minimums listed in Tables 1 and 2. Projects must meet the requirements for both weekday and weekend trips and provide service every day.

Table 1. Minimum daily transit service for projects with multiple transit types (bus, streetcar, rail, or ferry).

Weekday trips

Weekend trips

Points

60

40

1

76

50

2

100

65

3

132

85

4

180

130

5

246

150

6

320

200

7

Table 2. Minimum daily transit service for projects with commuter rail or ferry service only

Weekday trips

Weekend trips

Points

24

6

1

40

8

2

60

12

3

Projects served by two or more transit routes such that no one route provides more than 60% of the prescribed levels may earn an additional point, up to the maximum 7 points. If existing transit service is temporarily rerouted outside the required distances for less than two years, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about ND-Plan-v4 SLLc3