Log in
LEED v4
Neighborhood Development Plan
Green infrastructure & buildings
Rainwater management

LEED CREDIT

ND-Plan-v4 GIBc8: Rainwater management 1-4 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region.

Requirements

In a manner best replicating natural site hydrology processes, manage on site the runoff from the developed site for the percentile of regional or local rainfall events listed in Table 1, using low-impact development (LID) and green infrastructure. Use daily rainfall data and the methodology in the U.S. Environmental Protection Agency (EPA) Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act to determine the percentile amounts listed in Table 1. The percentile rainfall event indicates the total volume to be retained on site.

Table 1. Points for retaining rainwater on site

Percentile rainfall event

Points

80th

1

85th

2

90th

3

95th

4

Projects that earn at least 2 points under this credit may earn an additional point if the site meets one of the following criteria.
  • The project is located on a previously developed site.
  • The project achieves 1 point in SLL Credit Brownfield Remediation.
  • The project is designed to be transit ready by achieving at least 2 points each under NPD Credit Walkable Streets, NPD Credit Compact Development, and NPD Credit Mixed-Use Neighborhoods.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

10/1/2014Updated: 2/14/2015
Form Update
Description of change:
Added summary for Neighborhood Development projects
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site, based on historical conditions and undeveloped ecosystems in the region.

Requirements

In a manner best replicating natural site hydrology processes, manage on site the runoff from the developed site for the percentile of regional or local rainfall events listed in Table 1, using low-impact development (LID) and green infrastructure. Use daily rainfall data and the methodology in the U.S. Environmental Protection Agency (EPA) Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act to determine the percentile amounts listed in Table 1. The percentile rainfall event indicates the total volume to be retained on site.

Table 1. Points for retaining rainwater on site

Percentile rainfall event

Points

80th

1

85th

2

90th

3

95th

4

Projects that earn at least 2 points under this credit may earn an additional point if the site meets one of the following criteria.
  • The project is located on a previously developed site.
  • The project achieves 1 point in SLL Credit Brownfield Remediation.
  • The project is designed to be transit ready by achieving at least 2 points each under NPD Credit Walkable Streets, NPD Credit Compact Development, and NPD Credit Mixed-Use Neighborhoods.
See all LEEDuser forum discussions about this credit » Unsubscribe from discussions about ND-Plan-v4 GIBc8