Log in
LEED v4
Homes Mid-Rise
Energy and Atmosphere
Advanced utility tracking

LEED CREDIT

Mid-Rise-v4 EAc3: Advanced Utility Tracking 1-2 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To support energy efficiency efforts through real-time monitoring of energy and water use.

Requirements

Case 1. Single Family

Option 1. Electric and Water (1 point)

Meet one of the following:
Install a permanent energy-monitoring system that records at intervals of one hour or less and is equipped with the ability to transmits data to the homeowner or occupant at a remote location (e.g., computer, in-house display).
OR

If the project has an automatic in-ground irrigation system and the landscape irrigated area is larger than 1,000 square feet, install a submeter to monitor all irrigation system components.

AND/OR

Option 2. Third-Party Utility Reporting (1 point)

The homeowner must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

Case 2. Multifamily

Option 1. Energy Electric and Water (1 point)

In each unit, install a permanent energy-monitoring system that records at intervals of one hour or less and is equipped with the ability to transmit data to the homeowner or occupant at a remote location (e.g., computer, in-house display).

OR

If the project has an automatic in-ground irrigation system and the landscape irrigated area is larger than 1,000 square feet (93 square meters), install a submeter to monitor all irrigation system components.

AND/OR

Option 2. Third-Party Utility Reporting (1 point)
Path 1. Whole-Building Master Meter

The building owner must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

OR

Path 2. Individual Unit Meters

At least 50% of unit owners or occupants must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

Credit available for all projects, whether they are using the EA performance or EA prescriptive path
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To support energy efficiency efforts through real-time monitoring of energy and water use.

Requirements

Case 1. Single Family

Option 1. Electric and Water (1 point)

Meet one of the following:
Install a permanent energy-monitoring system that records at intervals of one hour or less and is equipped with the ability to transmits data to the homeowner or occupant at a remote location (e.g., computer, in-house display).
OR

If the project has an automatic in-ground irrigation system and the landscape irrigated area is larger than 1,000 square feet, install a submeter to monitor all irrigation system components.

AND/OR

Option 2. Third-Party Utility Reporting (1 point)

The homeowner must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

Case 2. Multifamily

Option 1. Energy Electric and Water (1 point)

In each unit, install a permanent energy-monitoring system that records at intervals of one hour or less and is equipped with the ability to transmit data to the homeowner or occupant at a remote location (e.g., computer, in-house display).

OR

If the project has an automatic in-ground irrigation system and the landscape irrigated area is larger than 1,000 square feet (93 square meters), install a submeter to monitor all irrigation system components.

AND/OR

Option 2. Third-Party Utility Reporting (1 point)
Path 1. Whole-Building Master Meter

The building owner must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

OR

Path 2. Individual Unit Meters

At least 50% of unit owners or occupants must share all applicable utility data with USGBC via a USGBC-approved third-party before the project team submits its application for certification.

Credit available for all projects, whether they are using the EA performance or EA prescriptive path
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Mid-Rise-v4 EAc3