LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. interior reuse (2 points)
Reuse or salvage interior nonstructural elements for at least 50% of the surface area. Hazardous materials that are remediated as a part of the project must be excluded from the calculation.AND/OR
Option 2. furniture reuse (1 point)
Reuse, salvage, or refurbish furniture and furnishings for at least 30% of the total furniture and furnishings cost.AND/OR
Option 3. design for flexibility (1 pointI)
Conduct an integrative planning process to increase the useful life of the project space. Increase project space flexibility, ease of adaptive use, and recycling of building materials while considering differential durability and premature obsolescence over building design life and individual component service lives. Use at least three of the following strategies.- Install accessible systems (floor or ceiling) for at least 50% of the project floor area to allow for flexible use of space and access to systems (under floor distribution systems) not entangled with other building systems.
- Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
- Ensure that at least 50%, by cost, of nonstructural materials have integral labels (radio frequency identification, engraving, embossing, or other permanent marking) containing information on material origin, properties, date of manufacture, in compliance with Canadian Standards Association CSA Z782-06 Guideline for Design for Disassembly and Adaptability in Buildings.
- Include in at least one major component or systems purchase contract a clause specifying sub-contractor, vendor, or on site take back system.
- Ensure that at least 50% of nonstructural materials, by cost, are reusable or recyclable, as defined by the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.12. [Canada ACP]
- Implement flexible power distribution (i.e., plug-and-play) systems for at least 50% of the project floor area so that lighting, data, voice, and other systems can be easily reconfigured and repurposed.
- Implement a flexible lighting control system with plug and play components such as wall controls, sensors, and dimming ballasts for a minimum of 50% of the lighting load. The system shall allow for reconfiguring and repurposing of luminaires and controls without rewiring such as having the capability to group and assign luminaires into zones and change those zones as needed. Also, the system shall be flexible so that as a space changes functions, the lighting levels can change to suit the needs of the space without rewiring or removing or adding luminaires.
Alternative Compliance Paths (ACPs)
Canada ACP - Environmental Claims
Projects in Canada may consider Environmental Claims: A Guide for Industry and Advertisers as an equivalent to the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.7(d). See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
How do you account for previously exposed structures that are finished as part of the project?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can crushed concrete, masonry, or asphalt being reused onsite qualify as materials reuse?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Would retaining the exterior windows contribute to the credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Addenda
"Projects in Canada may consider Environmental Claims: A Guide for Industry and Advertisers as an equivalent to the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.7(d)."
Change the numerator text “Total area with plug-and-play lighting systems” to “Total lighting load with plug and play lighting systems”
Make the last paragraph of Option 3 a bullet.
Make the last paragraph of Option 3 a bullet.
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. interior reuse (2 points)
Reuse or salvage interior nonstructural elements for at least 50% of the surface area. Hazardous materials that are remediated as a part of the project must be excluded from the calculation.AND/OR
Option 2. furniture reuse (1 point)
Reuse, salvage, or refurbish furniture and furnishings for at least 30% of the total furniture and furnishings cost.AND/OR
Option 3. design for flexibility (1 pointI)
Conduct an integrative planning process to increase the useful life of the project space. Increase project space flexibility, ease of adaptive use, and recycling of building materials while considering differential durability and premature obsolescence over building design life and individual component service lives. Use at least three of the following strategies.- Install accessible systems (floor or ceiling) for at least 50% of the project floor area to allow for flexible use of space and access to systems (under floor distribution systems) not entangled with other building systems.
- Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
- Ensure that at least 50%, by cost, of nonstructural materials have integral labels (radio frequency identification, engraving, embossing, or other permanent marking) containing information on material origin, properties, date of manufacture, in compliance with Canadian Standards Association CSA Z782-06 Guideline for Design for Disassembly and Adaptability in Buildings.
- Include in at least one major component or systems purchase contract a clause specifying sub-contractor, vendor, or on site take back system.
- Ensure that at least 50% of nonstructural materials, by cost, are reusable or recyclable, as defined by the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.12. [Canada ACP]
- Implement flexible power distribution (i.e., plug-and-play) systems for at least 50% of the project floor area so that lighting, data, voice, and other systems can be easily reconfigured and repurposed.
- Implement a flexible lighting control system with plug and play components such as wall controls, sensors, and dimming ballasts for a minimum of 50% of the lighting load. The system shall allow for reconfiguring and repurposing of luminaires and controls without rewiring such as having the capability to group and assign luminaires into zones and change those zones as needed. Also, the system shall be flexible so that as a space changes functions, the lighting levels can change to suit the needs of the space without rewiring or removing or adding luminaires.
Alternative Compliance Paths (ACPs)
Canada ACP - Environmental Claims
Projects in Canada may consider Environmental Claims: A Guide for Industry and Advertisers as an equivalent to the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.7(d).
How do you account for previously exposed structures that are finished as part of the project?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can crushed concrete, masonry, or asphalt being reused onsite qualify as materials reuse?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Would retaining the exterior windows contribute to the credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
"Projects in Canada may consider Environmental Claims: A Guide for Industry and Advertisers as an equivalent to the Federal Trade Commission Guide for Use of Environmental Marketing Claims, 260.7(d)."
Change the numerator text “Total area with plug-and-play lighting systems” to “Total lighting load with plug and play lighting systems”
Make the last paragraph of Option 3 a bullet.
Make the last paragraph of Option 3 a bullet.