Energy and Atmosphere

Optimize energy performance

LEED CREDIT

Hospitality-CI-v4 EAc2: Optimize Energy Performance 1-25 points

See all forum discussions about this credit »

SPECIAL REPORT

LEEDuser expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic harms associated with excessive energy use.

Requirements

Establish an energy performance target no later than the schematic design phase. The target must be established as kBtu per square foot-year (kW per square meter-year) of source energy use.

Choose one of the options below.

Option 1. Tenant-level energy simulation (1–25 points)

Analyze efficiency measures during the design process and account for the results in design decision-making. Analysis can include energy simulation of efficiency opportunities, energy simulation analyses for similar projects, or published data from energy analyses performed for similar projects (such as AEDGs).

Analyze efficiency measures focused on load reduction and HVAC-related strategies; passive measures are acceptable. Project the potential energy savings and cost implications for all affected systems.

Follow the criteria in EA Prerequisite Minimum Energy Performance to demonstrate a percentage improvement in the proposed tenant project performance rating compared with the baseline.

Table 1. Points for percentage improvement in energy performance

Interior construction Points
4% 4
5% 6
6% 8
7% 10
8% 11
9% 12
10% 13
11% 14
12% 15
13% 16
14% 17
15% 18
16% 19
17% 20
18% 21
20% 22
22% 23
24% 24
28% 25

OR

Option 2. Prescriptive compliance (1–16 points)

Use any combination of the strategies in any or all of the categories below.

Base Building Systems (2-6 points)

For base building systems that serve the project, as well as any applicable improvements that are part of the project, document compliance with the following according to base building type and climate zone. For projects outside the U.S., consult ASHRAE/ASHRAE/IESNA Standard 90.1–2010, Appendixes B and D, to determine the appropriate climate zone. 

  • Building Envelope, Opaque (2 points)
    Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all roofs, walls, floors, slabs, doors, vestibules, and continuous air barriers.
  • Building Envelope, Glazing (2 points)
    Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all vertical fenestration.
  • HVAC Equipment Efficiency (2 points)
    For all base building HVAC systems that serve the project, comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide.
HVAC Systems (2 points)
  • HVAC Zoning and Controls (2 points)
    For the tenant fit-out of spaces, provide a separate control zone for each solar exposure and interior space. Provide controls capable of sensing space conditions and modulating the HVAC system in response to space demand for all private offices and other enclosed spaces (e.g., conference rooms, classrooms).

Interior Lighting Power (1–4 points)

  • Lighting Power Density (1–4 points)
  • Reduce connected lighting power density below that allowed by ASHRAE/IESNA Standard 90.1–2010, either using the space-by-space method or applying the whole-building lighting power allowance to the entire tenant space. Points are awarded according to Table 2.

Table 2. Points for percentage reduction in lighting power density

Percentage below standard LPD Points
10% 1
15% 2
20% 3
25% 4

Interior Lighting Controls (1–2 points)

  • Daylighting Controls (1 point)
  • Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of the connected lighting load. Daylight controls must switch or dim electric lights in response to daylight illumination in the space.

  • Occupancy Sensor Lighting Controls (1 point)
  • Install occupancy sensors for at least 75% of the connected lighting load.

Equipment and Appliances (1–2 points)

  • ENERGY STAR Equipment and Appliances (1–2 points)
  • Install ENERGY STAR appliances, office equipment, electronics, and commercial food service equipment (HVAC, lighting, and building envelope products are excluded from this credit) or performance equivalent for projects outside the U.S.. Calculate their percentage of the total (by rated-power) ENERGY STAR–eligible products in the project. Points are awarded according to Table 3.

    Table 3. Points for installing ENERGY STAR equipment and appliances

    Percentage of ENERY STAR products Points
    70% 1
    90% 2
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

The energy cost offset from onsite renewable energy cannot be used to demonstrate compliance with the prerequisite. Can this cost offset still be credited to the proposed energy cost savings for this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic harms associated with excessive energy use.

Requirements

Establish an energy performance target no later than the schematic design phase. The target must be established as kBtu per square foot-year (kW per square meter-year) of source energy use.

Choose one of the options below.

Option 1. Tenant-level energy simulation (1–25 points)

Analyze efficiency measures during the design process and account for the results in design decision-making. Analysis can include energy simulation of efficiency opportunities, energy simulation analyses for similar projects, or published data from energy analyses performed for similar projects (such as AEDGs).

Analyze efficiency measures focused on load reduction and HVAC-related strategies; passive measures are acceptable. Project the potential energy savings and cost implications for all affected systems.

Follow the criteria in EA Prerequisite Minimum Energy Performance to demonstrate a percentage improvement in the proposed tenant project performance rating compared with the baseline.

Table 1. Points for percentage improvement in energy performance

Interior construction Points
4% 4
5% 6
6% 8
7% 10
8% 11
9% 12
10% 13
11% 14
12% 15
13% 16
14% 17
15% 18
16% 19
17% 20
18% 21
20% 22
22% 23
24% 24
28% 25

OR

Option 2. Prescriptive compliance (1–16 points)

Use any combination of the strategies in any or all of the categories below.

Base Building Systems (2-6 points)

For base building systems that serve the project, as well as any applicable improvements that are part of the project, document compliance with the following according to base building type and climate zone. For projects outside the U.S., consult ASHRAE/ASHRAE/IESNA Standard 90.1–2010, Appendixes B and D, to determine the appropriate climate zone. 

  • Building Envelope, Opaque (2 points)
    Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all roofs, walls, floors, slabs, doors, vestibules, and continuous air barriers.
  • Building Envelope, Glazing (2 points)
    Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all vertical fenestration.
  • HVAC Equipment Efficiency (2 points)
    For all base building HVAC systems that serve the project, comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide.
HVAC Systems (2 points)
  • HVAC Zoning and Controls (2 points)
    For the tenant fit-out of spaces, provide a separate control zone for each solar exposure and interior space. Provide controls capable of sensing space conditions and modulating the HVAC system in response to space demand for all private offices and other enclosed spaces (e.g., conference rooms, classrooms).

Interior Lighting Power (1–4 points)

  • Lighting Power Density (1–4 points)
  • Reduce connected lighting power density below that allowed by ASHRAE/IESNA Standard 90.1–2010, either using the space-by-space method or applying the whole-building lighting power allowance to the entire tenant space. Points are awarded according to Table 2.

Table 2. Points for percentage reduction in lighting power density

Percentage below standard LPD Points
10% 1
15% 2
20% 3
25% 4

Interior Lighting Controls (1–2 points)

  • Daylighting Controls (1 point)
  • Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of the connected lighting load. Daylight controls must switch or dim electric lights in response to daylight illumination in the space.

  • Occupancy Sensor Lighting Controls (1 point)
  • Install occupancy sensors for at least 75% of the connected lighting load.

Equipment and Appliances (1–2 points)

  • ENERGY STAR Equipment and Appliances (1–2 points)
  • Install ENERGY STAR appliances, office equipment, electronics, and commercial food service equipment (HVAC, lighting, and building envelope products are excluded from this credit) or performance equivalent for projects outside the U.S.. Calculate their percentage of the total (by rated-power) ENERGY STAR–eligible products in the project. Points are awarded according to Table 3.

    Table 3. Points for installing ENERGY STAR equipment and appliances

    Percentage of ENERY STAR products Points
    70% 1
    90% 2

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

The energy cost offset from onsite renewable energy cannot be used to demonstrate compliance with the prerequisite. Can this cost offset still be credited to the proposed energy cost savings for this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

LEEDuser expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Hospitality-CI-v4 EAc2