Homes-v2008 MRc1: Material-efficient framing 1-5 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

1.1 Framing order waste factor limit. Limit the overall estimated waste factor to 10% or less. If the waste factor on any portion of the framing order exceeds 10%, calculate the overall waste factor as shown in Table 1. Waste factor is defined as the percentage of framing material ordered in excess of the estimated material needed for construction.
Table 1. Sample Framing Order Waste Factor Calculation

Framing component

Total cost

Waste factor

Waste cost

Random lengths

$1,000

15%

$150

Studs

$2,000

5%

$100

Beams and headers

$500

20%

$100

Roof deck

$2,000

0%

$0

Wall sheathing

$0

0%

$0

Rafters

$2,000

0%

$0

Ceiling joists

$1,500

10%

$150

Cornice work

$3,000

10%

$300

TOTAL

$12,000

 

$1,000

Overall waste factor
(waste $ / cost $)

 

 

8.3%

Credits

1.2 Detailed framing documents (1 point). Prior to construction, create detailed framing plans or scopes of work and accompanying architectural details for use on the job site. Indicate the specific locations, spacing, and sizes of all framing members in the floors, walls, roof, and ceiling (if different from the roof ).1.3 Detailed cut list and lumber order (1 point). The requirements in MR 1.2 must be met to earn this credit. Prior to construction, create a detailed cut list and lumber order that corresponds directly to the framing plans and/ or scopes of work.

AND/OR

1.4 Framing efficiencies (maximum 3 points). Implement measures from Table 2.

OR

1.5 Off-site fabrication (4 points). Use either of the following alternatives to on-site framing:
  1. Panelized construction. Wall, roof, and floor components are delivered to the job site preframed.
  2. Modular, prefabricated construction. All principal building sections are delivered to the job site as prefabricated modules.
class=”lowercase_letter”>
Table 2. Efficient Framing Measures

Measure

Points

Precut framing packages

1.0

Open-web floor trusses

1.0

Structural insulated panel (SIP) walls

1.0

SIP roof

1.0

SIP floors

1.0

Stud spacing greater than 16” o.c

1.0

Ceiling joist spacing greater than 16” o.c.

0.5

Floor joist spacing greater than 16” o.c.

0.5

Roof rafter spacing greater than 16” o.c.

0.5

Implement any 2 of the following:

  • Size headers for actual loads
  • Use ladder blocking or drywall clips
  • Use 2-stud corners

0.5

Note: Alternative measures not listed in Table 2 may be eligible to earn points if they save comparable amounts of framing material. A formal credit interpretation request with full justification of any alternative measure’s potential savings must be submitted by the Provider to USGBC. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

1.1 Framing order waste factor limit. Limit the overall estimated waste factor to 10% or less. If the waste factor on any portion of the framing order exceeds 10%, calculate the overall waste factor as shown in Table 1. Waste factor is defined as the percentage of framing material ordered in excess of the estimated material needed for construction.
Table 1. Sample Framing Order Waste Factor Calculation

Framing component

Total cost

Waste factor

Waste cost

Random lengths

$1,000

15%

$150

Studs

$2,000

5%

$100

Beams and headers

$500

20%

$100

Roof deck

$2,000

0%

$0

Wall sheathing

$0

0%

$0

Rafters

$2,000

0%

$0

Ceiling joists

$1,500

10%

$150

Cornice work

$3,000

10%

$300

TOTAL

$12,000

 

$1,000

Overall waste factor
(waste $ / cost $)

 

 

8.3%

Credits

1.2 Detailed framing documents (1 point). Prior to construction, create detailed framing plans or scopes of work and accompanying architectural details for use on the job site. Indicate the specific locations, spacing, and sizes of all framing members in the floors, walls, roof, and ceiling (if different from the roof ).1.3 Detailed cut list and lumber order (1 point). The requirements in MR 1.2 must be met to earn this credit. Prior to construction, create a detailed cut list and lumber order that corresponds directly to the framing plans and/ or scopes of work.

AND/OR

1.4 Framing efficiencies (maximum 3 points). Implement measures from Table 2.

OR

1.5 Off-site fabrication (4 points). Use either of the following alternatives to on-site framing:
  1. Panelized construction. Wall, roof, and floor components are delivered to the job site preframed.
  2. Modular, prefabricated construction. All principal building sections are delivered to the job site as prefabricated modules.
class=”lowercase_letter”>
Table 2. Efficient Framing Measures

Measure

Points

Precut framing packages

1.0

Open-web floor trusses

1.0

Structural insulated panel (SIP) walls

1.0

SIP roof

1.0

SIP floors

1.0

Stud spacing greater than 16” o.c

1.0

Ceiling joist spacing greater than 16” o.c.

0.5

Floor joist spacing greater than 16” o.c.

0.5

Roof rafter spacing greater than 16” o.c.

0.5

Implement any 2 of the following:

  • Size headers for actual loads
  • Use ladder blocking or drywall clips
  • Use 2-stud corners

0.5

Note: Alternative measures not listed in Table 2 may be eligible to earn points if they save comparable amounts of framing material. A formal credit interpretation request with full justification of any alternative measure’s potential savings must be submitted by the Provider to USGBC.