Homes-v2008 IDpc28: Trades training
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To maximize opportunities for integrated, cost-effective adoption of green design and construction strategies.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.Requirements
Beginning prior to construction but after trades have been hired for the project, hold a total of 8 hours of field and/or classroom training focusing on the green aspects of the project, including each relevant LEED for Homes prerequisite, and the expectations for ensuring certification. Special focus should be on where trades have traditionally struggled in the past to meet the higher requirements of a green building. Include at least the following trades in the training:
- Plumbing
- Mechanical systems
- Insulation
- Framing
- Air Sealing
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.Credit Specific:
Submit documentation with dates, trainers, duration, and which trades were present.Additional Questions
- Was the trades training useful?
- What was the primary focus of the trades training: introduction to LEED, green building best practices, or other?
Background Information
Training the primary installation contractors before construction starts on the increased expectations and requirements of a LEED building should improve the quality of their installation, and the subsequent performance of the building.Changes
- Changes made 1/11/2011: Clarified that the training can be in field or classroom Added “framing” to the list of trades to include Added “The general contractor is strongly encouraged to be in attendance of these trainings.”
- Changes made 2/4/2011: Clarified that credit is available to 2008 mid-rise projects, but not to 2011 mid-rise projects, because it is a credit in the core mid-rise rating system.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To maximize opportunities for integrated, cost-effective adoption of green design and construction strategies.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.Requirements
Beginning prior to construction but after trades have been hired for the project, hold a total of 8 hours of field and/or classroom training focusing on the green aspects of the project, including each relevant LEED for Homes prerequisite, and the expectations for ensuring certification. Special focus should be on where trades have traditionally struggled in the past to meet the higher requirements of a green building. Include at least the following trades in the training:
- Plumbing
- Mechanical systems
- Insulation
- Framing
- Air Sealing
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.Credit Specific:
Submit documentation with dates, trainers, duration, and which trades were present.Additional Questions
- Was the trades training useful?
- What was the primary focus of the trades training: introduction to LEED, green building best practices, or other?
Background Information
Training the primary installation contractors before construction starts on the increased expectations and requirements of a LEED building should improve the quality of their installation, and the subsequent performance of the building.Changes
- Changes made 1/11/2011: Clarified that the training can be in field or classroom Added “framing” to the list of trades to include Added “The general contractor is strongly encouraged to be in attendance of these trainings.”
- Changes made 2/4/2011: Clarified that credit is available to 2008 mid-rise projects, but not to 2011 mid-rise projects, because it is a credit in the core mid-rise rating system.