Requirements

Meet both of the following requirements:

Bicycle network
Design or locate the project such that the building entrance and/or bicycle storage is within a 200-yard walk distance from at least one of the following:
  1. An existing bicycle network that connects to a school or employment center within 3 miles bicycling distance from the project boundary; or
  2. An existing bicycle network that connects to at least 10 community resources within 2 miles bicycling distance from the project boundary.
If the requirements border the project boundary, a safe, all-weather route must exist between the bicycle network and the project’s bicycle storage and/or main entrance. Planned and funded bicycle trails or lanes may be counted if they are funded and designated for completion within the fiscal year that the constructing organization finalizes the plans.
AND
Bicycle Storage
Provide at least one secure, enclosed bicycle storage space per occupant for 25% of all building occupants. Expect 2 persons for a studio or 1-bedroom apartment, with one additional person per additional bedroom. Bicycle storage areas must be locked, located under roof and easily accessible to residents. For multi-family buildings with more than 10 units, provide informational signage on using the storage facilities. Bicycle storage capacity may not be double counted; storage that is fully allocated to the occupants of non-project facilities cannot also serve project occupants. A single family dwelling unit with enclosed garage meets the bicycle storage requirement.
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.
Credit Specific:
  • Provide calculation showing the number of occupants compared to the number of bicycle storage spots
  • Provide map demonstrating that the project complies is within 3 miles of a school or employment center or within 2 miles of 10 community resources, and that the route is bicycle friendly
  • Green rater visually verifies that an adequate number of bicycle storage spots that are located in a locked and under roof area are present
Additional Questions
  • Did the project team meet this credit in more than one way? If so, which options were met, and why did the project team choose to submit one as the primary path for credit achievement?
Changes
  • Changes made 2/18/2011: Removed Mid-rise eligibility because a similar credit is available in LEED for Homes Mid-Rise.
  • Changes made for 2nd Public Comment (08/01/2011): Removed Option 2: Parking Capacity / Low Emitting and Fuel-Efficient Vehicles Included pathway for single-family housing Included requirements for bicycle network
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Meet both of the following requirements:

Bicycle network
Design or locate the project such that the building entrance and/or bicycle storage is within a 200-yard walk distance from at least one of the following:
  1. An existing bicycle network that connects to a school or employment center within 3 miles bicycling distance from the project boundary; or
  2. An existing bicycle network that connects to at least 10 community resources within 2 miles bicycling distance from the project boundary.
If the requirements border the project boundary, a safe, all-weather route must exist between the bicycle network and the project’s bicycle storage and/or main entrance. Planned and funded bicycle trails or lanes may be counted if they are funded and designated for completion within the fiscal year that the constructing organization finalizes the plans.
AND
Bicycle Storage
Provide at least one secure, enclosed bicycle storage space per occupant for 25% of all building occupants. Expect 2 persons for a studio or 1-bedroom apartment, with one additional person per additional bedroom. Bicycle storage areas must be locked, located under roof and easily accessible to residents. For multi-family buildings with more than 10 units, provide informational signage on using the storage facilities. Bicycle storage capacity may not be double counted; storage that is fully allocated to the occupants of non-project facilities cannot also serve project occupants. A single family dwelling unit with enclosed garage meets the bicycle storage requirement.
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.
Credit Specific:
  • Provide calculation showing the number of occupants compared to the number of bicycle storage spots
  • Provide map demonstrating that the project complies is within 3 miles of a school or employment center or within 2 miles of 10 community resources, and that the route is bicycle friendly
  • Green rater visually verifies that an adequate number of bicycle storage spots that are located in a locked and under roof area are present
Additional Questions
  • Did the project team meet this credit in more than one way? If so, which options were met, and why did the project team choose to submit one as the primary path for credit achievement?
Changes
  • Changes made 2/18/2011: Removed Mid-rise eligibility because a similar credit is available in LEED for Homes Mid-Rise.
  • Changes made for 2nd Public Comment (08/01/2011): Removed Option 2: Parking Capacity / Low Emitting and Fuel-Efficient Vehicles Included pathway for single-family housing Included requirements for bicycle network
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Homes-v2008 Former Pilot Credit LLpc30