LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
This article is BuildingGreen Premium content
Two ways to read the full article and get CEUs:
Sign up for BuildingGreen Premium to access all our premium content
Join for just $.../month »Purchase this article to get online access and a printable PDF.
Buy it now for $... »Already a premium member? Log in now
To read the full article, subscribe now to BuildingGreen Premium
For full access, sign up now for LEEDuser Premium
LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.
( does not provide premium access to LEEDuser)
Go premium for just $... » Go premium for just $... » Firm or campus members – click here »Your 15-day free trial expired on
Already a premium member? Log in now
Credit language

© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
These requirements only apply to “acoustically sensitive” rooms, such as bedrooms, dining rooms, living rooms, and studies. (“Acoustically insensitive” rooms include bathrooms, kitchens, and hallways.) Projects may also implement the measures throughout the entire home.Option 1. Prescriptive noise reduction methods.
Meet all of the following requirements:- Mechanical systems must meet the following requirements:
- Continuous ventilation fans shall have a maximum sound rating of 0.7 sones. Intermittent fans shall have a maximum sound rating of 1.5 sones, unless their maximum rated airflow exceeds 400 cfm. HVAC air handlers and remote-mounted fans are exempted, if the fans are mounted outside the habitable spaces, bathrooms, and hallways, and if there is at least 4 feet of ductwork between the fan and the intake grill.
- Meet the following best-practice HVAC installation measures:
- Ducts are securely attached (no loose connections between sections of ductwork).
- The fan housing is securely anchored.
- The damper flap closes fully, with no visible airspaces around the flap.
- For projects that are less than a half a mile away from any significant noise source such as (but not limited to) aircraft over-flights, highways, trains, and industry, exterior assemblies must include:
- Exterior windows and doors must have a minimum STC rating of 35.
- All exterior wall penetrations must be sealed with acoustical sealant,
- and/or otherwise treated for sound control (e.g. lined elbows on vents, lined exterior ducts where feasible).
- Attached single family homes and multi-family homes must also meet the following:
AND/OR
Option 2. Performance-based compliance requirements
Meet all of the following. The tested levels must be met in the acoustically sensitive room that is considered the worst case condition.- The maximum background noise level in the home or unit due to exterior noise sources cannot exceed 40 dBA, based on the peak hour Leq.
- The maximum background noise level in the home or unit due to interior noise sources (HVAC systems, lighting, and other building services operating simultaneously) shall not exceed 40 dBA, based on the peak Leq.
- Party walls must have a minimum NIC rating of 50.
- Floor-ceiling assemblies between units must have a minimum NIC and FIIC rating of 50.
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »This article is BuildingGreen Premium content
Two ways to read the full article and get CEUs:
Sign up for BuildingGreen Premium to access all our premium content
Join for just $.../month »Purchase this article to get online access and a printable PDF.
Buy it now for $... »Already a premium member? Log in now
To read the full article, subscribe now to BuildingGreen Premium
For full access, sign up now for LEEDuser Premium
LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.
( does not provide premium access to LEEDuser)
Go premium for just $... » Go premium for just $... » Firm or campus members – click here »Your 15-day free trial expired on
Already a premium member? Log in now
Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
This article is BuildingGreen Premium content
Two ways to read the full article and get CEUs:
Sign up for BuildingGreen Premium to access all our premium content
Join for just $.../month »Purchase this article to get online access and a printable PDF.
Buy it now for $... »Already a premium member? Log in now
To read the full article, subscribe now to BuildingGreen Premium
For full access, sign up now for LEEDuser Premium
LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.
( does not provide premium access to LEEDuser)
Go premium for just $... » Go premium for just $... » Firm or campus members – click here »Your 15-day free trial expired on
Already a premium member? Log in now
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
This article is BuildingGreen Premium content
Two ways to read the full article and get CEUs:
Sign up for BuildingGreen Premium to access all our premium content
Join for just $.../month »Purchase this article to get online access and a printable PDF.
Buy it now for $... »Already a premium member? Log in now
To read the full article, subscribe now to BuildingGreen Premium
For full access, sign up now for LEEDuser Premium
LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.
( does not provide premium access to LEEDuser)
Go premium for just $... » Go premium for just $... » Firm or campus members – click here »Your 15-day free trial expired on
Already a premium member? Log in now

© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
These requirements only apply to “acoustically sensitive” rooms, such as bedrooms, dining rooms, living rooms, and studies. (“Acoustically insensitive” rooms include bathrooms, kitchens, and hallways.) Projects may also implement the measures throughout the entire home.Option 1. Prescriptive noise reduction methods.
Meet all of the following requirements:- Mechanical systems must meet the following requirements:
- Continuous ventilation fans shall have a maximum sound rating of 0.7 sones. Intermittent fans shall have a maximum sound rating of 1.5 sones, unless their maximum rated airflow exceeds 400 cfm. HVAC air handlers and remote-mounted fans are exempted, if the fans are mounted outside the habitable spaces, bathrooms, and hallways, and if there is at least 4 feet of ductwork between the fan and the intake grill.
- Meet the following best-practice HVAC installation measures:
- Ducts are securely attached (no loose connections between sections of ductwork).
- The fan housing is securely anchored.
- The damper flap closes fully, with no visible airspaces around the flap.
- For projects that are less than a half a mile away from any significant noise source such as (but not limited to) aircraft over-flights, highways, trains, and industry, exterior assemblies must include:
- Exterior windows and doors must have a minimum STC rating of 35.
- All exterior wall penetrations must be sealed with acoustical sealant,
- and/or otherwise treated for sound control (e.g. lined elbows on vents, lined exterior ducts where feasible).
- Attached single family homes and multi-family homes must also meet the following:
AND/OR
Option 2. Performance-based compliance requirements
Meet all of the following. The tested levels must be met in the acoustically sensitive room that is considered the worst case condition.- The maximum background noise level in the home or unit due to exterior noise sources cannot exceed 40 dBA, based on the peak hour Leq.
- The maximum background noise level in the home or unit due to interior noise sources (HVAC systems, lighting, and other building services operating simultaneously) shall not exceed 40 dBA, based on the peak Leq.
- Party walls must have a minimum NIC rating of 50.
- Floor-ceiling assemblies between units must have a minimum NIC and FIIC rating of 50.
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey: