Log in
v4.1 LEED v2008
Homes-v2008Homes Homes
EQIndoor Environmental Quality Indoor Environmental Quality
EQc8Contaminant control Contaminant control

LEED CREDIT

Homes-v2008 EQc8: Contaminant control 1-4 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

None.

Credits

8.1 Indoor contaminant control during construction (1 point). Upon installation, seal all permanent ducts and vents to minimize contamination during construction. Remove any seals after all phases of construction are completed.8.2 Indoor contaminant control (1 point each, maximum 2 points). Select from the following measures:a. Design and install permanent walk-off mats at each entry that are at least 4 feet in length and allow accessibility for cleaning (e.g., grating with catch basin).b. Design a shoe removal and storage space near the primary entryway, separated from living areas. This space may not have wall-to-wall carpeting, and it must be large enough to accommodate a bench and at least two pairs of shoes per bedroom.c. Install a central vacuum system with exhaust to the outdoors. Ensure that the exhaust is not near any ventilation air intake.8.3 Preoccupancy flush (1 point). Flush the home with fresh air, according to the following guidelines:
  1. Flush prior to occupancy but after all phases of construction are completed.
  2. Flush the entire home, keeping all interior doors open.
  3. Flush for 48 total hours; the hours may be nonconsecutive, if necessary.
  4. Keep all windows open and run a fan (e.g., HVAC system fan) continuously or flush the home with all HVAC fans and exhaust fans operating continuously at the highest flow rate.
  5. Use additional fans to circulate air within the home.
  6. Replace or clean HVAC air filter afterward, as necessary.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $.../month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $... » Go premium for just $... » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $.../month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $... » Go premium for just $... » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Prerequisites

None.

Credits

8.1 Indoor contaminant control during construction (1 point). Upon installation, seal all permanent ducts and vents to minimize contamination during construction. Remove any seals after all phases of construction are completed.8.2 Indoor contaminant control (1 point each, maximum 2 points). Select from the following measures:a. Design and install permanent walk-off mats at each entry that are at least 4 feet in length and allow accessibility for cleaning (e.g., grating with catch basin).b. Design a shoe removal and storage space near the primary entryway, separated from living areas. This space may not have wall-to-wall carpeting, and it must be large enough to accommodate a bench and at least two pairs of shoes per bedroom.c. Install a central vacuum system with exhaust to the outdoors. Ensure that the exhaust is not near any ventilation air intake.8.3 Preoccupancy flush (1 point). Flush the home with fresh air, according to the following guidelines:
  1. Flush prior to occupancy but after all phases of construction are completed.
  2. Flush the entire home, keeping all interior doors open.
  3. Flush for 48 total hours; the hours may be nonconsecutive, if necessary.
  4. Keep all windows open and run a fan (e.g., HVAC system fan) continuously or flush the home with all HVAC fans and exhaust fans operating continuously at the highest flow rate.
  5. Use additional fans to circulate air within the home.
  6. Replace or clean HVAC air filter afterward, as necessary.
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Homes-v2008 EQc8