LEED v2008
Homes
Energy and Atmosphere
Active solar-ready design

Homes-v2008 EApc72: Active solar-ready design

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To reduce energy consumption and greenhouse gas emissions by designing to maximize opportunities for solar design.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.

Requirements

Option 1. Photovoltaic-Ready Design (1 point)
A project team that installs a photovoltaic (PV) system that meets the requirements of EA Credit Renewable Energy is not eligible for this credit. Meet EPA’s solar photovoltaic specifications for a renewable energy–ready home. Provide detailed information about such systems in the homeowner education manual so that future occupants can install an active PV system.

OR

Option 2. Solar Direct Hot Water–Ready Design (1 point)
A project team that installs a solar direct hot water (DHW) system that meets the requirements of EA Credit Water Heating is not eligible for this credit. Meet EPA’s solar water heating specifications for a renewable energy–ready home. Provide detailed information about such systems in the homeowner education manual so that future occupants can install an active solar DHW system.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific:
  • Provide completed Solar Ready checklist(s) and all required support documents
Additional questions:
  • Do any items in the solar ready checklists seem unreasonable or unnecessary?
  • Would additional resources or training on how to design/install required items be helpful? If so, what specifically would you like to see?
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.
See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To reduce energy consumption and greenhouse gas emissions by designing to maximize opportunities for solar design.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.

Requirements

Option 1. Photovoltaic-Ready Design (1 point)
A project team that installs a photovoltaic (PV) system that meets the requirements of EA Credit Renewable Energy is not eligible for this credit. Meet EPA’s solar photovoltaic specifications for a renewable energy–ready home. Provide detailed information about such systems in the homeowner education manual so that future occupants can install an active PV system.

OR

Option 2. Solar Direct Hot Water–Ready Design (1 point)
A project team that installs a solar direct hot water (DHW) system that meets the requirements of EA Credit Water Heating is not eligible for this credit. Meet EPA’s solar water heating specifications for a renewable energy–ready home. Provide detailed information about such systems in the homeowner education manual so that future occupants can install an active solar DHW system.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific:
  • Provide completed Solar Ready checklist(s) and all required support documents
Additional questions:
  • Do any items in the solar ready checklists seem unreasonable or unnecessary?
  • Would additional resources or training on how to design/install required items be helpful? If so, what specifically would you like to see?
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.
See all forum discussions about this credit »