LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To provide advanced monitoring and reconciliation of energy and water use at the whole building and end use levels. To provide for the ongoing accountability of building utility consumption over time.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.
Requirements
Case 1. Single family
Option 1: Energy and water
- Install an advanced energy monitoring system that meets the following requirements:
- Meters must be permanently installed,
- Record at intervals of 1 hour or less
- Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
- Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
AND/OR
Option 2. Building Performance Partnership
Homeowner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification/Case 2. Multi-family
Option 1. Energy and water
- Install an advanced energy monitoring system for each unit that meets the following requirements:
- Meters must be permanently installed,
- Record at intervals of 1 hour or less
- Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
- Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
AND/OR
Option 2. Building Performance Partnership
Path 1: Whole-building master meter
Building owner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.OR
Path 2. Individual unit meters
At least 50% of unit owners or occupants must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To provide advanced monitoring and reconciliation of energy and water use at the whole building and end use levels. To provide for the ongoing accountability of building utility consumption over time.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.
Requirements
Case 1. Single family
Option 1: Energy and water
- Install an advanced energy monitoring system that meets the following requirements:
- Meters must be permanently installed,
- Record at intervals of 1 hour or less
- Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
- Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
AND/OR
Option 2. Building Performance Partnership
Homeowner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification/Case 2. Multi-family
Option 1. Energy and water
- Install an advanced energy monitoring system for each unit that meets the following requirements:
- Meters must be permanently installed,
- Record at intervals of 1 hour or less
- Transmit data to the homeowner or occupant at a remote location (e.g, computer, in house display).
- Separate energy usage information for at least four end uses such as space conditioning, water heating, and major plug loads.
AND/OR
Option 2. Building Performance Partnership
Path 1: Whole-building master meter
Building owner must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.OR
Path 2. Individual unit meters
At least 50% of unit owners or occupants must enroll in the USGBC Building Performance Partnership (BPP) for all applicable utility accounts, prior to submitting for LEED Certification.General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey: