Innovation: Demand response

LEED CREDIT

Homes-v2008 BDC v4 EA Credit: Innovation: Demand response 1 point

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Design building and equipment for participation in demand response programs through load shedding or shifting. On-site electricity generation does not meet the intent of this credit.

Case 1. Demand response program available (2 points)
Participate in an existing demand response (DR) program and complete the following activities.
  • Design a system with the capability for real-time, fully-automated DR based on external initiation by a DR Program Provider. Semi-automated DR may be utilized in practice.
  • Enroll in a minimum one-year DR participation amount contractual commitment with a qualified DR program provider, with the intention of multiyear renewal, for at least 10% of the estimated peak electricity demand. Peak demand is determined under EA Prerequisite Minimum Energy Performance.
  • Develop a comprehensive plan for meeting the contractual commitment during a Demand Response event.
  • Include the DR processes in the scope of work for the commissioning authority, including participation in at least one full test of the DR plan.
Case 2. Demand response program not available (1 point)
Provide infrastructure to take advantage of future demand response programs or dynamic, real-time pricing programs and complete the following activities.
  • Install interval recording meters with communications and ability for the building automation system to accept an external price or control signal.
  • Develop a comprehensive plan for shedding at least 10% of building estimated peak electricity demand. Peak demand is determined under EA Prerequisite Minimum Energy Performance.
  • Include the DR processes in the scope of work for the commissioning authority, including participation in at least one full test of the DR plan.
  • Contact local utility representatives to discuss participation in future DR programs.

Documentation

See the LEED v4 Demand Response credit for sample form and documentation information. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Design building and equipment for participation in demand response programs through load shedding or shifting. On-site electricity generation does not meet the intent of this credit.

Case 1. Demand response program available (2 points)
Participate in an existing demand response (DR) program and complete the following activities.
  • Design a system with the capability for real-time, fully-automated DR based on external initiation by a DR Program Provider. Semi-automated DR may be utilized in practice.
  • Enroll in a minimum one-year DR participation amount contractual commitment with a qualified DR program provider, with the intention of multiyear renewal, for at least 10% of the estimated peak electricity demand. Peak demand is determined under EA Prerequisite Minimum Energy Performance.
  • Develop a comprehensive plan for meeting the contractual commitment during a Demand Response event.
  • Include the DR processes in the scope of work for the commissioning authority, including participation in at least one full test of the DR plan.
Case 2. Demand response program not available (1 point)
Provide infrastructure to take advantage of future demand response programs or dynamic, real-time pricing programs and complete the following activities.
  • Install interval recording meters with communications and ability for the building automation system to accept an external price or control signal.
  • Develop a comprehensive plan for shedding at least 10% of building estimated peak electricity demand. Peak demand is determined under EA Prerequisite Minimum Energy Performance.
  • Include the DR processes in the scope of work for the commissioning authority, including participation in at least one full test of the DR plan.
  • Contact local utility representatives to discuss participation in future DR programs.

Documentation

See the LEED v4 Demand Response credit for sample form and documentation information.