LEED v4
Healthcare
Energy and Atmosphere
Building-level energy metering

Healthcare-v4 EAp3: Building-level energy metering Required

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.

Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification or typical occupancy , whichever comes first. At a minimum, energy consumption must be tracked at one-month intervals.

This commitment must carry forward for five years or until the building changes ownership or lessee.

See all forum discussions about this credit »

Frequently asked questions

Is there an example commitment letter that I can use?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

29/07/2022– Updated: 01/09/2022
Reference Guide Correction
Description of change:
100002550

Resources tab Changes:

1. After the sentence "We will update this list as we enable support for additional data sources.". add the following 2 sentences:

"Projects are required to submit energy and water consumption data to USGBC on the date they begin typical, physical occupancy. Alternatively, projects may opt to provide data beginning on the date that the project accepts certification from GBCI. USGBC currently accepts energy and water data in the following ways:"

2. Under the heading "Third Party Data Source", add the following sentence as the first bullet in the list:

"Use Arc to share your data at https://arcskoru.com/ by activating your project, creating a meter and entering your performance data."

3. Under the heading "Third Party Data Source", delete the following bullets from the list:

"Coming Soon: Share data using one of USGBC’s App Lab partners. These apps are created by authorized partners and are designed to automate data submission into LEED Online. This option is not yet available from the partners on the site however please contact us to learn more about connecting with an existing data management system."

" Use Arc to share your data at https://arcskoru.com/"

4. Under the heading "USGBC Approved Data Template", replace the sentence that begins "Projects that choose this option must be prepared.." with the following sentence:

"Projects that choose this option should submit their spreadsheets to USGBC’s Hightail Dropbox at least two times per year."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). Utility-owned meters capable of aggregating building-level resource use are acceptable.

Commit to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered) for a five-year period beginning on the date the project accepts LEED certification or typical occupancy , whichever comes first. At a minimum, energy consumption must be tracked at one-month intervals.

This commitment must carry forward for five years or until the building changes ownership or lessee.

See all forum discussions about this credit »

Frequently asked questions

Is there an example commitment letter that I can use?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Frequently asked questions

Is there an example commitment letter that I can use?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

29/07/2022– Updated: 01/09/2022
Reference Guide Correction
Description of change:
100002550

Resources tab Changes:

1. After the sentence "We will update this list as we enable support for additional data sources.". add the following 2 sentences:

"Projects are required to submit energy and water consumption data to USGBC on the date they begin typical, physical occupancy. Alternatively, projects may opt to provide data beginning on the date that the project accepts certification from GBCI. USGBC currently accepts energy and water data in the following ways:"

2. Under the heading "Third Party Data Source", add the following sentence as the first bullet in the list:

"Use Arc to share your data at https://arcskoru.com/ by activating your project, creating a meter and entering your performance data."

3. Under the heading "Third Party Data Source", delete the following bullets from the list:

"Coming Soon: Share data using one of USGBC’s App Lab partners. These apps are created by authorized partners and are designed to automate data submission into LEED Online. This option is not yet available from the partners on the site however please contact us to learn more about connecting with an existing data management system."

" Use Arc to share your data at https://arcskoru.com/"

4. Under the heading "USGBC Approved Data Template", replace the sentence that begins "Projects that choose this option must be prepared.." with the following sentence:

"Projects that choose this option should submit their spreadsheets to USGBC’s Hightail Dropbox at least two times per year."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow