100002038
Step-by-step: remove the "All Projects" section and move these steps to Option 1 as Steps 4-7:
"Complete the steps below for the chosen option.
Option 1. Calculated Water Use (E and P)
Step 1. Determine baseline (E)...
Step 2. Gather information for calculator (E)...
Step 3. Complete calculations (E)...
Step 4. Inspect and repair all existing fixtures and fittings (E)
Make any repairs needed to bring all fixtures and fittings into good working order. Permanently turn off the water supply to any nonfunctional units.
Step 5. Create fixture and fitting replacement and retrofit policy (E)
Develop and implement a policy specifying that all newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling be WaterSense labeled (or a local equivalent for projects outside the U.S.).
If plumbing capacity is insufficient to support WaterSense fixtures, include a narrative explaining why WaterSense fixtures would not perform well.
Schools, Retail, and Hospitality projects must include applicable appliances in the building and under site management’s control.
Step 6. Document new purchases and installations (P)
Document any new purchases and installations of fixtures, fittings, and appliances to demonstrate compliance.
Demonstrate that all applicable fixture and/or fitting purchases made during the performance period meet the requirements of the fixture and fitting replacement and retrofit policy.
For Schools, Retail, and Hospitality projects, demonstrate that all applicable appliances purchased during the performance period meet the prerequisite requirements and replacement and retrofit policy.
Step 7. Confirm calculations (P)
Confirm that the calculations reflect the building’s current water use and recalculate as necessary."
Required documentation: change the table so that it is organized by option:
Documentation Option 1 Option 2
E Indoor water use calculator X
E Replacement and retrofit policy X
E,P Water meter data (baseline and performance period) X
P Calculations X