Streamline documentation and research by taking data gathered from subs via the Environmental Material Reporting Form and transfer it into a master spreadsheet for all the items being tracked for each product across MR and IEQ credits.
Include submittal requirements within each targeted construction spec section and add general requirements to the Division 1 bid package. Include copies of any submittal documents that the subcontractors and general contractor may need to fill out.
Whenever possible, designate in the construction specifications that contractors use specific sources you have verified as suppliers of recycled content items. This will help save research time for the contractors and ensure credit compliance.
Analyze the initial cost budget to know what materials the project can target and incorporate LEED requirement language accordingly into construction specs for those specific materials. The contractor will appreciate not filling out forms for materials that are not recycled, or that have so little cost value that it is a waste of time.
Incorporating the LEED requirements directly on the drawings as well as in the specs is a good way to remind the contractor and subcontractors of the requirements.
The LEED-CI Reference Guide does not explicitly mention what CSI division items to include in your baseline material budget, although it does specify that furniture must be included. Based on the NC, CS, and Schools rating systems you should include items as defined in CSI MasterFormat Divisions 3-10 and 12. Foundations and sitework don’t apply to most LEED-CI projects.