Log in

Action Steps

Provide the total site area restored or protected, total site area (including the building footprint), the building footprint, a site plan showing all natural areas contributing to credit compliance and, if you are providing full documentation (not attemp

Provide the total site area restored or protected, total site area (including the building footprint), the building footprint, a site plan showing all natural areas contributing to credit compliance and, if you are providing full documentation (not attempting the streamlined LPE path), a list of the native and adapted vegetation that contributes to credit compliance. If you are providing documentation through the streamlined LPE path, a Registered Landscape Architect needs to sign off stating that the requirements for native or adapted plantings have been achieved. 

Upload documentation to LEED Online after construction activities have ended. You have two documentation options:The contractor can declare that the requirements have been met by signing credit form, confirming credit compliance. You can upload const

Upload documentation to LEED Online after construction activities have ended. You have two documentation options:

  1. The contractor can declare that the requirements have been met by signing credit form, confirming credit compliance. 
  2. You can upload construction documents that show your site’s limited disturbance boundaries for credit compliance.