Conduct periodic inspections for moisture buildup, standing water, and improper storage of absorptive materials. These activities are consistent with implementation of IEQc3.1.
Implement the construction-related components of the IAQ management plan, and ensure that correct procedures are being followed throughout construction.
Hold an orientation meeting with the contractor to review all LEED-specific issues, such as the IAQ management plan during construction, mold prevention, and product purchasing.
Finalize the IAQ management plan. Verify that the plan addresses the issues outline in the U.S. Environmental Protection Agency (EPA) document, Building Air Quality: A Guide for Building Owners and Facility Managers.
After your initial detective work to identify paths you can pursue, review those paths with operations staff and design team members, checking to see that you are still on course to achieve targeted SSc1, Option 2 paths.